My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75E - PH 2525 MAIN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
02/05/2019
>
75E - PH 2525 MAIN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 4:04:49 PM
Creation date
2/1/2019 3:58:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75E
Date
2/5/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that an Environmental Impact Report (State Clearinghouse Number #2018021031) <br />would be prepared; and <br />WHEREAS, during the public comment period, copies of the Initial Study were <br />available for review and inspection at City Hall (20 Civic Center Plaza), on the City's <br />website, and at the Santa Ana Public Library (26 Civic Center Plaza); and <br />WHEREAS, pursuant to Public Resources Code section 21083.9 and State <br />CEQA Guidelines sections 15082(c) and 15083, the City held a duly noticed Scoping <br />Meeting on March 1, 2018, to solicit comments on the scope of the environmental <br />review of the proposed Project; and <br />WHEREAS, 163 comment letters were received in response to the NOP; and <br />WHEREAS, a Draft Environmental Impact Report ("Draft EIR") was prepared for <br />the proposed Project, addressing comments received in response to the NOP and <br />evaluating the proposed Project's potentially significant environmental impacts; and <br />WHEREAS, the Draft EIR concluded that the proposed Project would have a <br />significant and unavoidable impact to Aesthetics with the implementation of mitigation <br />measures regarding the existing visual character of the Project Site and its <br />surroundings, as implementation of the proposed Project would result in a significant <br />and unavoidable change in visual scale, height, and setbacks from Santiago Park, <br />Edgewood Road, and North Bush Street; and <br />WHEREAS, the Draft EIR further determined that mitigation measures were <br />required to mitigate impacts to a less than significant level for the following resource <br />areas: Air Quality, Biological Resources, Hazards and Hazardous Materials, Noise, and <br />Tribal Cultural Resources; and <br />WHEREAS, in accordance with State CEQA Guidelines section 15085, a Notice <br />of Completion was prepared and filed with the Office of Planning and Research on <br />August 7, 2018; and <br />WHEREAS, as required by State CEQA Guidelines section 15087(a), the City <br />provided a Notice of Availability of the Draft EIR to the public - and published the Notice <br />of Availability in the Orange County Register - at the same time that the City sent a <br />Notice of Completion to the Office of Planning and Research, on August 7, 2018; and <br />WHEREAS, during the public comment period, copies of the Draft EIR and <br />technical appendices were available for review and inspection at City Hall (20 Civic <br />Center Plaza), on the City's website, and at the Santa Ana Public Library (26 Civic <br />Center Plaza); and <br />WHEREAS, during the public comment period, on August 27, 2018, the Planning <br />Commission held a duly noticed public hearing to receive comments on the Draft <br />Environmental Impact Report pursuant to State CEQA Guidelines section 15087(i); and <br />75E-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.