My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75E - PH 2525 MAIN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
02/05/2019
>
75E - PH 2525 MAIN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 4:04:49 PM
Creation date
2/1/2019 3:58:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75E
Date
2/5/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />groundwater levels at 110 feet below the ground surface and 143 feet below the ground surface. In <br />addition, borings on the Project site in 2017 identified that soils consist of silty fine to medium sands with <br />local layers of fine to coarse sands with gravel size rock and some larger rock fragments, which are not <br />the uniform fine-grained sand that typically liquefies. In addition, the Geotechnical Engineering <br />Investigation (Geo 2017) prepared for the Project site conducted liquefaction analysis and determined that <br />thin layers of onsite soils have the potential for liquefaction; however, these soils are confined by less <br />permeable soils that would prevent the manifestation of liquefaction. Thus, because the groundwater level <br />is far below 50 feet below the ground surface and soils are not uniformly graded fine-grained, the potential <br />for liquefaction and related lateral spreading or ground failure to occur on the Project site is low. In <br />addition, as described above, the proposed Project would be required to be constructed in compliance with <br />the CBC and the City's Municipal Code, as detailed in the Geotechnical Engineering Investigation (Geo <br />2017) prepared for the Project site, which would be verified through the City's permitting process. (Initial <br />Study, pp. 30-31) <br />For the aforementioned reasons, the Project would result in a less than significant impact related to <br />liquefaction, lateral spreading, and ground failure. (Initial Study, pp. 30-31) <br />9.6.1.4 Exposure to Potential Risk of Loss, Injury, or Death — Landslides <br />Threshold: Would the Project expose people or structures to potential substantial adverse effects, <br />including the risk of loss, injury or death involving landslides? <br />Finding: No impact. (DEIR, p. 2-6; Initial Study, p. 31) <br />Facts in Support of Finding: Landslides and other slope failures are secondary seismic effects that are <br />common during or soon after earthquakes. Areas that are most susceptible to earthquake induced <br />landslides are steep slopes underlain by loose, weak soils, and areas on or adjacent to existing landslide <br />deposits. As described above, the Project site is located in a seismically active region subject to strong <br />ground shaking. However, the Project site is not located within or adjacent to an earthquake -induced <br />landslide area. (Initial Study, p. 31.) In addition, the Project site is located in a flat developed urban area <br />that does not contain or is adjacent to large slopes, and the Project would not generate large slopes. <br />Furthermore, as stated in the Geotechnical Engineering Investigation prepared for the Project site, the <br />Project site is not at risk for earthquake induced landslides. For the foregoing reasons, implementation of <br />the Project would not expose people or structures to substantial adverse effects involving landslides, and <br />impacts related to landslides would not occur. (Initial Study, p. 31.) <br />9.6.2 Soil Erosion <br />Threshold: Would the Project result in substantial soil erosion or the loss of topsoil? <br />Finding: Less than significant impact. (DEIR, p. 2-6; Initial Study, pp. 31-32.) <br />Facts in Support of Finding: The Project site is largely impervious, as it is generally covered by <br />pavement or the building structure. However, small areas of landscaping exist within the parking area, <br />along the site boundary, and adjacent to the existing building. The Project would redevelop the site for <br />multi -family residential uses, which would include areas of landscaping that would surround the proposed <br />structures and be located along the site boundary, similar to the areas of landscaping that currently exist. <br />The new paved areas and landscaping from the Project would not result in soil erosion or the loss of <br />topsoil. In addition, Section 18-156 of the City of Santa Ana Municipal Code states that all significant <br />Resolution No. <br />Certification of the Magnolia at the Park EIR <br />75E-66 <br />Page 28 of 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.