My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KOA
Clerk
>
Contracts / Agreements
>
K
>
KOA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 10:33:53 AM
Creation date
2/12/2019 2:43:39 PM
Metadata
Fields
Template:
Contracts
Company Name
KOA
Contract #
A-2019-008
Agency
PUBLIC WORKS
Council Approval Date
1/15/2019
Expiration Date
1/14/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT PROJECT EXPERIENCE WITH REFERENCES <br />The City is seeking a qualified engineering firm <br />to provide design services for the Bush Street <br />Bicycle Boulevard. KOA is the perfect company <br />to take on this project. We have been successful <br />in providing design, outreach, grant management, <br />and construction support services to deliver bike <br />boulevard projects from the planning and concept <br />phase through to construction. We have been <br />fortunate in designing bike -related and bike boulevard <br />projects in urban settings for public agencies across <br />Southern California, including the cities of Costa <br />Mesa, San Clemente, Irvine, San Juan Capistrano, <br />Long Beach, Wildomar, Pasadena, and many others. <br />Our projects have included the design of roundabouts <br />with bulb -out corners and biofiltration swales, <br />landscaped traffic circles, median refuges for <br />pedestrian and bicycle crossings, traffic signals with <br />bicycle -only access, bike detectors, signing and <br />striping, and wayfinding signage. We have built a <br />strong foundation of understanding the needs of a <br />community to connect residents and businesses by <br />providing safe and accessible active transportation <br />opportunities. <br />Mrweo,A <br />Over the course of conducting our bike boulevard <br />projects, we have learned that providing proper and <br />cost-effective drainage solutions for roundabout, <br />traffic circle, and bulb -out treatments is fundamental <br />to the feasibility and constructability of the project. <br />It is important to provide maximum traffic calming <br />benefits such as increased vehicle deflection <br />angles around traffic circles while balancing <br />maneuverability for trucks and emergency vehicles. <br />Funding to Improve poor pavement conditions is a big <br />consideration when weighing the cost to rehabilitate <br />versus the risk of tripping liability issues. ADA <br />compliance is an increasingly hot topic; we are vastly <br />familiar with knowing how and when to design for it <br />in bike boulevards. We are proud of our quality work <br />and commitment to addressing design issues with <br />our clients, funding, and utility agencies for active <br />transportation projects. <br />The following table lists bicycle design projects that <br />KOA has completed in the past five years or which <br />we are currently working on. Selected projects are <br />described in more detail, beginning on the next page. <br />Typc AG PROJECT <br />Bike Blvd Final Deskin Lon Beach Daisy/Myrtle 10-Miles N -S. Bike Blvd PS&E <br />X <br />.. <br />X <br />X <br />X <br />X <br />Bike Blvd Final Design Long Beach Delta Ave. Bike Blvd. Conce t & Final Design <br />X <br />X <br />X <br />I X <br />I X <br />X <br />X <br />Bike Blvd Final Design Long Beach Vista Street Bike Blvd Final Desi n <br />X <br />X <br />X <br />X <br />X <br />Bike Blvd/Cycle Track Concept <br />Desi n <br />Pasadena <br />Bikeway Transportation Action Plan <br />X <br />X <br />X <br />X <br />X <br />Bike F cility Final Desi n <br />Costa Mesa <br />W. 19th St. Bike Facilit <br />Desi n Services <br />X <br />X <br />X <br />I X <br />I X <br />X <br />X <br />Bike Facility Final Design <br />Los An eles <br />LA River Re Tonal Bike <br />Path <br />X <br />X <br />X <br />Bike Facility Final Design <br />San Juan <br />Capistrano <br />Citywide Bikeway Gap Closure <br />X <br />X <br />X <br />Bike Facility Final Design <br />S. Pasadena <br />IMission St. Bike Im rovement PS&E <br />X <br />X <br />X <br />X <br />X <br />X <br />Bike FacilityFinal Design <br />Wildomar <br />Bike Lanes & Multi-Pur ose Trail PS&E <br />X <br />X <br />X <br />X <br />X <br />Cycle Track Final Desi n <br />Lon Beach <br />3rd & Broadwa C cle Track PS&E <br />X <br />X <br />X <br />X <br />Cycle Track Final Design <br />Temple City <br />Rosemead Blvd Cycle Track <br />PS&E <br />X <br />I <br />X <br />X <br />Bike/Ped Facility Final Design <br />San Clemente <br />N. El Camino Real Class I Bike & Ped Path <br />Desi n <br />X <br />X <br />X <br />X <br />Bike/Ped <br />FacilityFinal Design <br />POLB <br />5. Waterfront/Pier <br />J Bike & Ped Path PS&E <br />X <br />X <br />X <br />X <br />X <br />X <br />Bike/Ped <br />Facility Concept Design <br />Pasadena <br />Avenue 64 complete <br />Street <br />1 X <br />X <br />X <br />BiketPed <br />Facilit Concept Design <br />Pasadena <br />Hill Ave. Complete Streets Pro ect <br />X <br />X <br />X <br />X <br />Bike <br />Facilit Conce t Des i n <br />Santa Ana <br />Central Area Com lete Streets Concept Plan <br />X <br />X <br />X <br />X <br />Bike <br />FacilityConce t Desi n <br />Santa Ana <br />Downtown Com lete Streets Concept Plan <br />X <br />X <br />X <br />X <br />CITY <br />
The URL can be used to link to this page
Your browser does not support the video tag.