Laserfiche WebLink
KOP,A <br />RESUMES <br />RYAN CALAD, PE <br />EDUCATION <br />PEDESTRIAN SIGNAL DESIGN TASK LEADER <br />BA, Social Ecology (Urban <br />KOA I Senior Engineer <br />Planning Focus), University of <br />California, Irvine, CA <br />Mr. Ryan Calad has completed extensive work for traffic signal timing <br />and synchronization, signing and striping plans, signal modifications, <br />Cart., Type 2070 Traffic Signal <br />traffic control plans, traffic impact assessments, parking studies, and <br />Controllers, University of <br />parking management plans. His specific work experience includes <br />California, Berkeley Technology <br />highway improvement projects, intersection and arterial capacity <br />Transfer Program (Course TE- <br />analyses, traffic signal coordination, intersection design, cost estimates, <br />09) <br />and simulation studies. <br />REGISTRATIONS <br />RELEVANT EXPERIENCE <br />Professional Engineer, <br />SBCTA Metrolink Station Accessibility Improvement Project <br />Traffic, CA #2692 <br />PS&E, ROW Engineering & Design Support Services During <br />Construction, San Bernardino County, CA <br />Professional Engineer, <br />Project Manager. Six Metrolink stations in the Inland Empire <br />Civil, AZ #63514 <br />were determined to be the first set to receive first/last-mile access <br />improvements. KOA put together a construction bid package to provide <br />PROFESSIONAL <br />assistance during construction. The improvements included road <br />AFFILIATIONS <br />diets, traffic signal modifications, enhanced crossings, trail extensions, <br />Institute of Transportation <br />sidewalk design, wayfinding signage, striping, automated rail crossing <br />Engineers <br />gates for pedestrians, bicycle lockers, bicycle parking, bicycle facilities, <br />pavement repairs, and lighting. Mr. Calad designed and oversaw the <br />Intelligent Transportation Society <br />plans, cost estimates, and final submittals. <br />of California <br />City of Laguna Beach Coast Highway PS&E Intersection <br />Improvement, Laguna Beach, CA <br />Project Manager. KOA prepared a feasibility study of the City's <br />downtown area along Coast Highway. The corridor is heavily utilized by <br />both vehicular traffic and pedestrians during the peak summer periods, <br />creating congestion. After City Council approval of the study, KOA was <br />contracted for the PS&E design and construction for five intersections <br />that included extensions of left turn pockets, relocation and removal of <br />crosswalks, relocating parking spaces, conversion of Ocean Avenue to a <br />one-way street, and implementation of pedestrian scramble crosswalks <br />at two locations. <br />City of Orange As -Needed Traffic Engineering Services, Orange, <br />CA <br />Project Manager. Since December 2007, KOA has been providing <br />as -needed traffic engineering services for a wide variety of traffic - <br />related projects. KOA has prepared grant applications, traffic studies, <br />and signal design plans under the direction of the City. Mr. Calad has <br />managed multiple signal modification/timing projects for the City. <br />BUSH STREET BICYCLE BOULEVARD DESIGN SERVICES <br />30 <br />REP NO. r <br />CITY OF SANTA ANA <br />