My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75E - PH - 2525 N. MAIN ST._ADJOURNED
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
02/19/2019
>
75E - PH - 2525 N. MAIN ST._ADJOURNED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:12:32 PM
Creation date
2/14/2019 2:23:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75E
Date
2/19/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />7.1 Aesthetics <br />7.1.1 Visual Character <br />Threshold: Would the Project substantially degrade the existing visual character or quality of the <br />site and its surroundings? <br />Findings: Significant and Unavoidable. (DEIR, pp. 4.1-16 through 4.1-26.) <br />Facts in Support of Finding: As described in Section 4.1,.4 esthetics, of the DEIR, with implementation <br />of the Project, views of the Project site from the adjacent Santiago Park area would change from setback <br />views of the existing 2 -story office building partially screened by mature landscaping to that of forefront <br />views of the 5 -story residential building, with a landscaped tree buffer directly adjacent to the park. This <br />would result in a significant and unavoidable change in views of the Project site from the park. The <br />difference in scale and height, due to the Project's location adjacent to the park, and limited visual setback <br />buffer with the proposed landscaping, would result in a substantial difference in scale, height, and property <br />setbacks that is considered significant pursuant to the City's criteria related to the visual character of the <br />site in comparison to the park. Thus, the visual change in height, scale, and setbacks from Santiago Park <br />would be significant and unavoidable. (DEIR, pp. 4.1-16 through 4.1-26.) <br />In addition, implementation of the Project would result in a significant and unavoidable change in visual <br />scale, height, and setbacks from Edgewood Road and N. Bush Street. The background views of urban <br />buildings would become forefront views, and the proposed size and scale of the Project would <br />substantially increase the overall visual density of the built environment. The difference in visual scale <br />and height with the proposed structure adjacent to the roadway and limited of visual setback buffer, would <br />be substantial and considered significant pursuant to the City's criteria. Thus, the visual change related to <br />the height, scale, and setback from Edgewood Road and N. Bush Street would be significant. (DEIR, pp. <br />4.1-21.) <br />The Project includes the following PDF that would reduce the visual impacts of the Project: <br />PDF -1: The landscape plan will incorporate the existing mature trees located along the eastern <br />Project site boundary and to the extent feasible protect and preserve the existing mature trees <br />within the 15 -foot setback along the southern boundary within the 15 -foot setback along the <br />southern boundary that were identified as healthy by the Arborist Report. (DEIR, p. 3-18.) <br />In addition, Mitigation Measure AES -1 require measures be implemented to retain and protect the trees <br />along the eastern and southern Project site boundary and would reduce these impacts. Mitigation Measure <br />AES -1 provides: <br />Mitigation Measure AES -1: Construction plans and specifications shall state that the following measures <br />shall be implemented by the construction contractor to protect the trees along the eastern Project site <br />boundary and to the extent feasible protect and preserve the existing mature trees within the 15 -foot <br />setback along the southern boundary within the 15 -foot setback along the southern boundary that are <br />planned for preservation during construction of the proposed Project pursuant to the 2018 Arborist Report: <br />• If the wall along the eastern boundary of the Project site cannot be heightened in-place and must <br />be replaced, it shall be reconstructed with a precast concrete fence or a wall without a continuous <br />footing. <br />Resolution No. _ <br />Certification of the Magnolia at the Park EIR <br />75E-48 <br />Page 10 of 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.