Laserfiche WebLink
City of Santa Ana <br />Page 2 <br />Mabury Park Storrrnaater Capture (19.6425), bidding <br />on January 10, 2019 2:00 PM (Pacille) <br />Printed 09!10/2019 <br />Bid Results <br />Type <br />Item Code <br />UOM <br />qty <br />Unit Price <br />Line Total Comment <br />6 <br />Mulch (3") <br />SF <br />1200 <br />$1.00 <br />$1,200.00 <br />7 <br />Sod <br />SF <br />8200 <br />$1.20 <br />$9,840.00 <br />8 <br />Dry Creek Bed Cobble <br />SF <br />900 <br />$5.40 <br />$4,860.00 <br />9 <br />PCC Sidewalk (T=4") <br />SF <br />160 <br />$12.00 <br />$1,800.00 <br />10 <br />PCC Cross -Gutter <br />SP <br />270 <br />$18.00 <br />$4,860.00 <br />11 <br />PCC Curb and Gutter (A-2-8) <br />LF <br />60 <br />$80.00 <br />$4,800.00 <br />12 <br />PCC Parkway Culvert <br />EA <br />2 <br />$2,400.00 <br />$4,800.00 <br />13 <br />1 Gallon Shrub <br />EA <br />100 <br />$10.00 <br />$1,000.00 <br />14 <br />Boulder <br />EA <br />10 <br />$250.00 <br />$2,500.00 <br />16 <br />Adjust Manhole Frame and Cover <br />EA <br />1 <br />$1,000.00 <br />$1,000.00 <br />16 <br />Interpretive Sign <br />EA <br />1 <br />$2,000.00 <br />$2,000.00 <br />17 <br />Project Advertisement Sign <br />EA <br />1 <br />$5,000.00 <br />$5,000.00 <br />18 <br />12" PVC Overflow Drain <br />LS <br />1 <br />$2,500.00 <br />$2,500.00 <br />19 <br />Signing & Striping <br />LS <br />1 <br />$2,000.00 <br />$2,000.00 <br />20 <br />Irrigation <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />21 <br />90 -Day irrigation 8 Landscape Maintenance Period <br />LS <br />1 <br />$6,000.00 <br />$6,000.00 <br />PlanetSids, Inc. <br />20C-14 <br />