Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF THE PROJECT NO. 19-6425: MABURY PARK <br />STORMWATER CAPTURE <br />Construction Contract <br />$ <br />328,160.00 <br />Contract Administration <br />$ <br />22,624.00 <br />Inspection and Testing <br />$ <br />26,600.00 <br />Contingencies <br />$ <br />97,616.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />j $ <br />475,000.00 <br />EXHIBIT 5 <br />20C-45 <br />