My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - 1ST ST LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
02/19/2019
>
23A - PROJ - 1ST ST LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 4:20:07 PM
Creation date
2/14/2019 4:16:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
2/19/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 19-6495 <br />FIRST STREET UNDERCROSSING STORMWATER LIFT STATION <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Arnaz Engineering Contractors, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />cehedule: <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />SW <br />Amount <br />, <br />1 <br />Design Services <br />1 <br />LS <br />$ <br />$ <br />2 <br />Clearing and Grubbing <br />1 <br />LS <br />$ <br />$ <br />3 <br />Masonry Retaining Wall <br />150 <br />LF <br />$ <br />$ <br />4 <br />PCC Curb & Gutter (A-2-8) <br />60 <br />LF <br />$ <br />$ <br />5 <br />PCC Curb (B-1) <br />30 <br />LF <br />$ <br />$ <br />6 <br />PCC Swale (T=4") <br />900 <br />SF <br />$ <br />$ <br />7 <br />PCC Sidewalk (T=4") <br />80 <br />SF <br />$ <br />$ <br />8 <br />PCC Driveway Approach (T=8") <br />230 <br />SF <br />$ <br />$ <br />9 <br />PCC Driveway (T--8' } <br />1,500 <br />SF <br />$ <br />$ <br />10 <br />PCC Catch Basin (Type `B") <br />5 <br />EA <br />$ <br />$ <br />11 <br />Remove Existing Tree <br />10 <br />EA <br />$ <br />$ <br />12 <br />Demolish Existing Stair Assembly <br />1 <br />LS <br />$ <br />$ <br />13 <br />Demolish Existing Gravity Discharge Box <br />1 <br />LS <br />$ <br />$ <br />14 <br />Demolish Existing Pipe <br />I <br />LS <br />$ <br />$ <br />P-1 of P-16 <br />23A-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.