Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 19-6495: First Street Undercrossing <br />Stormwater Lift Station <br />Construction Contract <br />$ <br />630,300.00 <br />Contract Administration <br />$ <br />48,545.00 <br />Inspection and Testing <br />$ <br />46,000.00 <br />Contingencies <br />$ <br />63,030.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />787,875.00 <br />EXHIBIT 4 <br />23A-37 <br />