My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARAMEXX GROUP INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARAMEXX GROUP INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 11:09:58 AM
Creation date
2/15/2019 1:42:50 PM
Metadata
Fields
Template:
Contracts
Company Name
ARAMEXX GROUP INC.
Contract #
19-2703
Agency
Public Works
Council Approval Date
2/5/2019
Document Relationships
23A - CONTRACT AWARD LANDSCAPE PROJ
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\02/05/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- City of Santa Ana <br />Page 2 <br />Jerome <br />Center Landscape Drainage (19-2703), bidding on January 29, 2019 <br />2:00 PM (Pacific) <br />Printed 01/29/2019 <br />Exhibit A <br />Bid Results <br />Type <br />Item Code <br />UOM <br />Qty <br />Unit Price <br />Llne Total Comment <br />5 <br />Remove Existing and Construct PCC Walkway (T=4") <br />SF <br />310 <br />$25.00 <br />$7,750,00 <br />6 <br />Remove Existing and Construct PCC Curb 8, Gutter (A-2-6) <br />LF <br />24 <br />$95,00 <br />$2,280.00 <br />7 <br />Furnish and Install Precast Concrete Splash Block <br />LF <br />8 <br />$460.00 <br />$3,600.00 <br />8 <br />Furnish and Install 4" Perforated PVC Pipe <br />LF <br />180 <br />$25.00 <br />$4,000.00 <br />9 <br />Furnish and Install 4" PVC Pipe <br />LF <br />170 <br />$25.00 <br />$4,250.00 <br />10 <br />Furnish and Install 6" PVC Pipe <br />LF <br />100 <br />$30.00 <br />$3,000.00 <br />11 <br />Furnish and Install 8" PVC Pipe <br />LF <br />170 <br />$35.00 <br />$5,950.00 <br />12 <br />Furnish and Install 12"x12" Drain Inlet <br />EA <br />2 <br />$250.00 <br />$600.00 <br />13 <br />PCC Parkway Culvert <br />I;A <br />1 <br />$2,800.00 <br />$2,800.00 <br />14 <br />Project Advertising Sign <br />EA <br />1 <br />$1,000,00 <br />$1,000.00 <br />16 <br />Labor Agreement Oversight <br />LS <br />1 <br />$5,000.00 <br />$6,000,00 <br />Subtotal <br />$83,155.00 <br />Total <br />$83,155.00 <br />PlanetElds, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.