My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 75E
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
02/19/2019
>
CORRESPONDENCE - 75E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 9:40:18 AM
Creation date
2/19/2019 2:03:40 PM
Metadata
Fields
Template:
City Clerk
Item #
75E
Date
2/5/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on Main St. so the neighboring streets will have to be used. This will detract from the quality of life for <br />the existing residents of Park Santiago. <br />Section 4.11 Transportation and Traffic <br />The traffic study does not take into account the impact of all the other projects that are approved or <br />proposed for the general area. The additional traffic will find its way into the Park Santiago, <br />specifically Edgewood and Santiago streets. <br />The traffic study shows that freeways are already unsatisfactory and cannot just ignore that this <br />project will only worsen the situation. That should not be acceptable. <br />Thank you, <br />Alan Fuller <br /> <br /> <br />F <br />
The URL can be used to link to this page
Your browser does not support the video tag.