My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19H - ALTERNATIVE ENERGY STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
03/05/2019
>
19H - ALTERNATIVE ENERGY STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 7:29:55 AM
Creation date
2/28/2019 7:24:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19H
Date
3/5/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6: POTENTIAL FOR HEAD RECOVERY AT MWD CONNECTIONS 19 <br />The projected cost to purchase and install the new hydro turbine is $835,988. This involves the purchase of the <br />new turbine generator set with electrical panel and controls, the construction of a new vault below the sidewalk <br />to house the turbine and switchgear, the connection with SCE including a new transformer to accept the power, <br />and integration with the existing SCADA controls. <br />6.6 MWD STATION SA -6 <br />The pressure reducing station SA -6 is installed in a vault under the sidewalk at the northeast corner of E. Santa <br />Clara Avenue and Tustin Avenue. The configuration is shown in Figure 5, with three PRVs and six isolation <br />valves, approximately eight feet below the sidewalk. The SCADA monitoring and associated electrical meter are <br />installed in small cabinets mounted nearby on the sidewalk. The SCE Service Account number and rate schedule <br />is not known. <br />The three PRVs are installed in parallel at different sizes, 6 -inch, 10 -inch and 16 -inch. The combined operation <br />of these PRVs is typically controlled at 12 CFS. The typical pressure drop through this station is assumed to be <br />the typical MWD pressure (177 psig) reduced to the upper zone pressure of 100 psig, for a pressure difference of <br />77 psig (or 178 feet). <br />Figure 5 <br />SA -6 Existing Configuration <br />.............................. <br />.............................. <br />Pressure Relief <br />Valve_ <br />h. ,T 24 I To Santa Ana <br />hrust 11 <br />Block <br />Pressure <br />Reduction <br />6" 70" 7y'• Valves with <br />Flow Control <br />24 I L.J <br />MWD <br />Thrust <br />Block <br />Vault Under Sidewalk <br />6.7 POTENTIAL PROJECT AT SA -6 <br />The proposed project at SA -6 is to install a new hydro turbine generator in parallel with the existing Pressure <br />Reducing Valves. There is no room in the existing vault, so a new vault would be required, potentially on the <br />north side of the existing vault. This is illustrated in Figure 6. The new vault would contain the new hydro <br />Newcomb I Anderson I McCormick 19H-27 CITY OF SANTA ANA <br />
The URL can be used to link to this page
Your browser does not support the video tag.