My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19H - ALTERNATIVE ENERGY STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
03/05/2019
>
19H - ALTERNATIVE ENERGY STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 7:29:55 AM
Creation date
2/28/2019 7:24:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19H
Date
3/5/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job No. 2669.01 Water Systems Alternative Energy Feasibility Study <br />Foreword <br />The City of Santa Ana Public Works Agency, Water Resources Division, hired Newcomb Anderson McCormick <br />(NAM), a Willdan company, to evaluate the potential to offset some of their electricity purchases with <br />renewable energy. The Agency uses electricity from Southern California Edison (SCE) at about 30 sites around <br />the city for pumping out of wells and pressurizing the distribution system. NAM evaluated past records of <br />pumping operations and electricity use; visited the prospective sites; and reviewed the 2017 Master Water Plan <br />from the Agency. <br />NAM also evaluated the potential to generate electricity from solar power by covering the water storage tanks <br />with solar collectors and by recovering head from the water delivered directly from the Metropolitan Water <br />District. This evaluation assumes that the hydro turbine at SA -1 would continue to generate renewable <br />electricity at its current reduced capacity as a baseline. The savings in this report are the marginal additional <br />savings that would be generated by a new turbine. <br />NAM created cost estimates for constructing these projects and calculated the potential monetary savings by <br />utilizing the new proposed SCE rate schedules, as opposed to the current rates. In addition, a life cycle cost <br />analysis for each option was performed. <br />NAM would like to thank the assistance in performing this project that was provided by Water Resources <br />Manager, Nabil Saba and Assistant Engineer II, Brian Ige. <br />CITY OF SANTA ANA 19H-5 Newcomb I Anderson I McCormick <br />
The URL can be used to link to this page
Your browser does not support the video tag.