My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19H - ALTERNATIVE ENERGY STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
03/05/2019
>
19H - ALTERNATIVE ENERGY STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 7:29:55 AM
Creation date
2/28/2019 7:24:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19H
Date
3/5/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(nyon <br />(2, <br />Va <br />Hydro <br />Commonly start-up, commissioning and training services are of value following installation. For a project of <br />this type we can typically send a single technician who is capable of covering the mechanical and <br />electrical portions of the equipment package. If start-up, commissioning and training assistance is of <br />interest we suggest budgeting $8,000-$10,000 for a qualified Canyon Hydro technician. <br />I look forward to working with you to ensure our equipment package meets all the requirements of the site <br />and project. Please contact me as questions arise or as additional project information becomes available. <br />Sincerely, <br />Ryan Maloney <br />Canyon Hydro- the water power division of Canyon Indust'Ik�i�r�(�.elue Heron Lane • P.O. Box 36 • Deming WA 98244 <br />360.592-5552 • Fax: 360.592.2235 • email: urbmt canyonhydro.com • www.canyonhydro.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.