My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19H - ALTERNATIVE ENERGY STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
03/05/2019
>
19H - ALTERNATIVE ENERGY STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 7:29:55 AM
Creation date
2/28/2019 7:24:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19H
Date
3/5/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exclusions <br />We have not included the following items which are required for our equipment or the project in <br />general: <br />• Relay protection study (values from the study will be inserted into our relays). <br />• Secondary injection test at site to prove the results of the protection study. <br />• Any and all activities related to on-line grid connection with the utility. <br />• Any and all power and control cabling for main and auxiliary systems. <br />• Any and all civil works including sealing of cable ducts. <br />• Any and all crane hire and lifting arrangements. <br />• Grounding mat. <br />• Broadband connection/phone line for any remote communication. <br />• HV switchgear. <br />• Hydraulic Control Module <br />• Any and all Building Services. <br />• Any and all activities related to the head level sensing. <br />• Any and all physical Installation activities related to the lifting and positioning of the <br />equipment. <br />• Plant installation and commissioning supervision. <br />• Performance testing. <br />• Any and all site set up, facilities and additional site labour. <br />Extent of Supply <br />The supply of Gilkes plant terminates at the following points: <br />• Turbine inlet -at the upstream face of the main inlet valve. <br />• Turbine discharge — at the draft tube discharge. <br />• Generator—at the generator terminal connectors. <br />• Electrical — at the LV of the generator switchgear <br />19H-79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.