Laserfiche WebLink
Exclusions <br />We have not included the following items which are required for our equipment or the project in <br />general: <br />• Relay protection study (values from the study will be inserted into our relays). <br />• Secondary injection test at site to prove the results of the protection study. <br />• Any and all activities related to on-line grid connection with the utility. <br />• Any and all power and control cabling for main and auxiliary systems. <br />• Any and all civil works including sealing of cable ducts. <br />• Any and all crane hire and lifting arrangements. <br />• Grounding mat. <br />• Broadband connection/phone line for any remote communication. <br />• HV switchgear. <br />• Hydraulic Control Module <br />• Any and all Building Services. <br />• Any and all activities related to the head level sensing. <br />• Any and all physical Installation activities related to the lifting and positioning of the <br />equipment. <br />• Plant installation and commissioning supervision. <br />• Performance testing. <br />• Any and all site set up, facilities and additional site labour. <br />Extent of Supply <br />The supply of Gilkes plant terminates at the following points: <br />• Turbine inlet -at the upstream face of the main inlet valve. <br />• Turbine discharge — at the draft tube discharge. <br />• Generator—at the generator terminal connectors. <br />• Electrical — at the LV of the generator switchgear <br />19H-79 <br />