My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19H - ALTERNATIVE ENERGY STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
03/05/2019
>
19H - ALTERNATIVE ENERGY STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 7:29:55 AM
Creation date
2/28/2019 7:24:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19H
Date
3/5/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Data —Turbine #1 <br />The technical data given in this quotation, unless specifically guaranteed, will be subject to <br />confirmation in the event of an order. <br />Model <br />No. of Units <br />Mean Diameter of Runner <br />Rated Speed <br />Maximum Overspeed <br />Maximum continuous overspeed period <br />Runner material <br />Shaft orientation <br />Mechanical shaft power at 244.5ft Net <br />Head and 8cfs Flow <br />Turbine efficiency at 244.5ft Net Head <br />and 8cfs Flow <br />Performance Curve <br />250 G100 Francis Turbine <br />1 <br />250 mm <br />1200 rpm <br />2220 rpm <br />2 minutes in any 24-hour period <br />CA6NM or equivalent Stainless steel <br />Horizontal <br />147 kW <br />88.5 <br />The following performance and efficiency curve are representative of your project's hydraulic <br />conditions and is depicts the turbine's mechanical power (kW) and efficiency (%) as a function of head <br />(ft) and flow (cfs). <br />19H-82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.