Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF THE PROJECT NO. 16-2692: NEW PARK AT 6TH STREET <br />AND LACY STREET <br />Construction Contract <br />$ <br />976,973.84 <br />Contract Administration <br />$ <br />66,500.00 <br />Inspection and Testing <br />$ <br />80,046.16 <br />Contingencies <br />$ <br />97,698.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />-1,221;218.00 <br />EXHIBIT 4 <br />23A-33 <br />