My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT CAMERA SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
03/05/2019
>
25B - AGMT CAMERA SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 7:30:43 AM
Creation date
2/28/2019 7:25:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25B
Date
3/5/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A-3: Second Amendment to MSA <br />(A-2017-289) <br />SIEMENS <br />January 15, 2019 <br />CtWofSantaAaa <br />Parks & Recreation - Multisite Site Project <br />Description of Work: Contractor is to provide electrical, low voltage and concrete contracting <br />services for City of Santa Ana park security enhancement project that include the following sites: <br />L Chepas Paris <br />2. Jerome Park <br />3. Santa Anita Park <br />4. Memorial Park <br />Statement of Work: <br />The below scope of work and cost reflects changes that occurred in scope ofwork and cost since <br />May 8 2018. Work shall include the following: <br />Qmura& <br />Furnish and install 2 outdoor 1P cameras, one (1) fix camera on the building, one (1) multi view <br />camera on the pole (4 camera heads),1 outdoor IP SIP loud speaker,1 server, l network switch,1 <br />vertical wall mounted server rack, all associated cabling, associated power supplies and <br />programming, per the following: <br />l.ieht Pole - Next to Basketball Court <br />• Work with the parks department in the new playground area to install underground <br />conduit in a trench between the building and the light pole at a minimum of 2 ft deep <br />between the light pole and the recreation building. Where the conduit is exposed above the <br />ground to the public, rigid conduit will be used. <br />• Cut the concrete where necessary for the trench line and replace. Remove the concrete from <br />score line to score line where it is reasonably possible. Pin all concrete replacement Place <br />in -ground pull boxes where necessary. Backfill the inside of the pull boxes with dirt and a V <br />slurry cover after the final inspections. <br />• Pole Mount one (1) multi view camera on the pole (4 camera heads) on the pole with any <br />necessary enclosures. <br />• Run Cat6 OSP outdoor rated cables from the IDF enclosure inside the Recreation Building to <br />all equipment mounted on the building and the pole. <br />.1 ,uu 1 F �.i• <br />• Install one (1) network fixed camera on the roofs edge viewing the restroom entrances and <br />install rigid conduit where it is exposed on the exterior of the building. <br />• Install one (1) outdoor loud speaker on the side of the building facing towards the street <br />• Install Cat6 OPS cable to the camera and the loud speaker from the IN enclosure. <br />• Install inside the building on the wall above the computer desk, on a fire rated backboard, a <br />vertical low profile IN enclosure, server, PoE switch and other miscellaneous items inside <br />Page I 1 <br />25B-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.