My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT CAMERA SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
03/05/2019
>
25B - AGMT CAMERA SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 7:30:43 AM
Creation date
2/28/2019 7:25:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25B
Date
3/5/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIEMENS <br />boxes with dirt and a 1" slurry cover after the final inspections. <br />• Trench a minimum of 2 ft. deep between the light pole and the Code Blue Tower base. Place <br />in the trench PVC conduit and wire for 120vac 20 amp power for the Code Blue Tower <br />receptacle. Verify circuit is in proper working order. Install new 20 amp circuit if required. <br />Keep power for scoreboard. <br />• Install concrete base 24" base x 36" deep, insure concert base is sloped to for water to run <br />off from CodeBlue Tower. <br />• Install CodeBlue tower on concrete base <br />• Install I10VAC quad outlet to base of CodeBlue Tower. <br />• Siemens shall mount all cameras (one (1) PTZ and one (1) 360 deg camera) on CodeBlue <br />Tower. <br />Water Company Pump Station Building <br />• Install on the roof edge one custom pole mount <br />• Pole mount one (1) outdoor PTZ camera. <br />• Pole mount one (1) outdoor loud speaker. <br />• Pole mount one (1) Ubiquity radio link pointed at the high pole west of the scoreboard <br />radio link. <br />• Install one (1) NEMA enclosure inside the building. <br />• Install equipment power supplies and one (1) PoE Switch in the enclosure. <br />• Install a 120vac quad outlet in the enclosure connected to the closest 120vac power source <br />inside the building. <br />• Install Cat6 OSP cabling for all outdoor equipment <br />Additional Installation Requirements: <br />1. All required fire stopping shall be UL listed 3M Fire barrier Caulk or 4hr, UL rated <br />equivalent is required. Retain one (1) used cartridge for documentation. <br />2. Each pole and field enclosure location shall be interconnected via conduit <br />3. All outdoor equipment shall be weather proofed to protect devices, cabling and structures <br />from the outdoor elements. <br />4. All risers and lateral connections into the field enclosures, both Security and IT/Telecom <br />enclosures shall be schedule 80 rigid steel construction. <br />S. Conduit elbows may be schedule 80 PVC construction, assuming the connection to steel <br />risers occurs within the concrete foundation. Any conduit elbows that are not embedded <br />within a concrete foundation shall be schedule 80 and rigid steel construction. <br />6. All above ground conduit shall be galvanized rigid steel unless otherwise noted. <br />7. Conduit runs shall allow for 50% additional capacity. All conduits shall have a "pull string" <br />installed and remain for future use. <br />8. All work shall meet or exceed the latest requirements of all national, state, county and <br />municipal codes. <br />9. All required permits and inspection certificates shall be provided by others. <br />10. All work shall conform to the National Electrical Code, National Fire Codes, NFPA Life Safety <br />Code and other local codes. <br />Page 13 <br />25B-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.