Laserfiche WebLink
Exhibit A-5: Second Amendment to MSA <br />(A-2017-289) <br />SIEMENS <br />January 15, 2019 <br />C31tyotSantaAna <br />Parks & Recreation — Multisite Site Project <br />Description of Work: Contractor is to provide electrical, low voltage and concrete contracting <br />services for City of Santa Ana park security enhancement project that include the following sites: <br />1. Chepas Park <br />2. Jerome Park <br />3. StintaAaftaPark <br />4. Memorial Park <br />Statement of Work <br />The below scope of work and cost reflects changes that occurred in scope ofwork and cost since <br />May 8 2018. Work shall include the following: <br />Furnish and install 7 outdoor IP cameras, 3 outdoor IP SIP loud speakers, l server,1 Poll network <br />switch,1 vertical wall mounted server rack, all associated cabling, associated power supplies and <br />programming, per the following: <br />Recreation/Community Center Building <br />• Install seven (6) outdoor fixed cameras mounted on the building, viewing the surround <br />park and restrooms entrance. <br />• Install EMT conduit on the exterior of the building roof top areas. <br />• Install three (3) outdoor loud speakers mounted on the building. <br />• Install one (1) outdoor PTL camera on a custom built fence pole extension at the rear of the <br />swimming pool fence line corner. Install rigid conduit on the upper fence line from the PTL <br />camera to the building. <br />• The Parks Dept will modify a fence gate to accommodate the new conduit path above the <br />gate. <br />• Install inside the building electrical room on a fire rated backboard, a vertical low profile <br />IDF enclosure, server, PoE switch and other miscellaneous items inside the enclosure. <br />Provide inside the IDF enclosure a 120vac quad outlet on a dedicated 20amp circuit <br />• Install Cat6 OSP cable for all outdoor equipment <br />• Connect to the city network switch. <br />Additional Installation Requirements: <br />1. All required fire stopping shall be UL listed 3M Fire barrier Caulk or Or, UL rated <br />equivalent is required. Retain one (1) used cartridge for documentation. <br />2. Each pole and field enclosure location shall be interconnected via conduit <br />Page I 1 <br />25B-18 <br />