My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29A - STREET LIGHT IMPROVEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
03/05/2019
>
29A - STREET LIGHT IMPROVEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 7:32:18 AM
Creation date
2/28/2019 7:25:45 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
29A
Date
3/5/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOUTHERN CALIFORNIA <br />EDISON' <br />Aa EDISONIA7rR,VATIOA'ALr C�Pan} <br />Southern Califamia Edison Company <br />20 CIVICCENTERPLZ <br />SAMA ANA CA 92701 4058 <br />Document <br />7590188999 <br />Invoice Term: <br />90 Days <br />Customer Nome: <br />SANTA ANA, CITY OF <br />Customer Email: <br />JELNIOREOSANTA-ANA.ORG <br />Invoice Dale: <br />09/06/2018 <br />SCE Contact: <br />Moises hlaninez <br />Telephone <br />amount will typically consist of installation and semi" labor required far Ilia work request. The additional labor amount will <br />Install - Billing Option: <br />typically consist of labor for inspection, cable and equipment make-up, dead ending, OmfGe council, grounding, supervision, and <br />District Address: <br />1241 SOUTH GRAND AVENUE SANTA ANA CA 92705 <br />Description Amount <br />Service Request Number 2549600 Project Location: HAZARD/HARBOR VARLOC SANTA ANA CA 92703 <br />Project Description UPGRADE LUMINAIRES X 62/RM ST LT X4 Invoice 325948 <br />Design 0: 1063696 Design Description UPGRADE LUMINAIRES X 62 / RM ST LT X 4 <br />Product d: 1436493 - UPGRADE LUMINAIRE <br />LABOR. This amount represents the total SCE labor required to complete the work request. In most casts, this labor amount <br />will consist of construction labor and any additional labor required for completing the work request. Tim construction labor <br />amount will typically consist of installation and semi" labor required far Ilia work request. The additional labor amount will <br />59,23&99 <br />typically consist of labor for inspection, cable and equipment make-up, dead ending, OmfGe council, grounding, supervision, and <br />switching. All applicable labor related overheads fm items such as the design, engineering, and project management ore also <br />included in the told SCE labor mount. <br />MATERIAL: This amount represent, the total SCE material required to complete the work request. Inmost cases, this material <br />322,J53.05 <br />amount will consist afconstructiun material and any additional material required for completing the wok request The <br />construction material will typically consist of installation and service material such as tronsfmmes; cable, conductor, poles, <br />metes, riser, switches. fusing equipmarn, handholes, and cross -anus All applicable material related overheads are also included <br />OTHER, This amount represents the total SCE other costs required to complete the work request. Inmost cases, this other <br />50.00 <br />amount will consist ofall additional requirements needed for completing the work request. This otherammon typically consists <br />of items such as Added Facilities one time charges, contractor work, rights check, and pemths. <br />TOTAL LA BOR,\IATERLAL, OTHER: <br />SI0,689.03 <br />CREDITS; This amount represents the total SCE credits required to complete the work request. In most cases, this credit <br />S(124.00) <br />amount will consist of. Salvage Credit Depreciation Credit JPA Credit Overhead Equivalent Credit <br />TOTAL CREDITS: <br />5(124.00) <br />NET CONSTRUCTION BILLING / RELOCATION ADVANCE: <br />S30-%&03 <br />TAX: I. ITCC on Applicant Furnished Tax Base (Taxable Amount). <br />50.00 <br />Tax Race, <br />0.00% <br />Tax Amount <br />S0.00 <br />2. [TCC on Net Construction (Less Non Taxable Amount) Tac Base (Taxable Amount). <br />S0,00 <br />Tax Rate: <br />0.0095 <br />Tax Account: <br />SO.00 <br />TOTALTAXs <br />50.00 <br />DEPOSITS: <br />Preliminary Design & Engineering Advance <br />50,00 <br />Previous Payment <br />SO.00 <br />TOTAL DEPOSITS: <br />- SO.00 <br />COMIMF.NTS: <br />e Enclosed ons two copies of you invoice. Picnic return one copy of the invoice with your payment to Accounts Receivable in <br />die enclosed return -addressed envelope. The other copy of the invoice is fm your records. <br />r ALL PRICES ARE APPLICABLE FOR A PERIOD OF 90 DAYS FRONT THIS DATE AND ARE SUBIECT TO CHANGE <br />THEREAFTER. <br />r All payments most be delivered by mail. an alternate postal method, as one ofciur electronic payment options. Walk-in <br />payments are no longer accepted m my SCE location, including Accounts Receivable. <br />r Plaase complete all applications and/or contracts and return to you planning office, using the enclosed remm-addressed <br />envelope. <br />TOTAL PROJECT INVOICE AMOUNT: <br />S30-6SA3,,., <br />CYYIQIT 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.