Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 18-6915: Euclid Street Rehabilitation from <br />Hazard Avenue to Westminster Avenue <br />Construction Contract <br />$ <br />985,301.00 <br />Contract Administration <br />$ <br />47,500.00 <br />Inspection and Testing <br />$ <br />54,216.70 <br />Design Engineering <br />$ <br />23,344.30 <br />Contingencies <br />$ <br />98,530.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />1,208,892.00 <br />EXHIBIT 5 <br />20A-35 <br />