My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - SA-5 VAULT MOD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
04/02/2019
>
23A - PROJ - SA-5 VAULT MOD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 2:38:23 PM
Creation date
3/28/2019 11:36:55 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
4/2/2019
Destruction Year
2024
Document Relationships
T.E. ROBERTS INC.
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 7r.] <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO,: 11.6413 <br />5A-5 VAULT MODIFICATIONS <br />AID PRQPOI AL <br />TO; CITY COUNCIL OF THE CffY OF SANTA ANA <br />FROM: 7. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish <br />all material and do all the work required to complete the said work in accordance with said plans (if <br />any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: <br />Item <br />Bid Items <br />Unit <br />Qty <br />Unit Price <br />Amount <br />1.* <br />h,7obillzationl'17enarrblFdzatiot� <br />LS <br />1 <br />$`.,� � <br />$.,_._..�y.e�p.^ <br />1 <br />Sheeting, Shoring and <br />'french Protection�,t"rJ <br />L <br />1 <br />3 <br />Construct Steel Water Main <br />(SA -5 Pi ping) <br />1 <br />�'— <br />$ "( `5-00— <br />Construct 16 -inch ductile <br />4, <br />Iron Pipe Water Main <br />LS <br />1 <br />$ _ � f1 i� .� <br />R t3 0 <br />(South of 5A-5 Vault) <br />Construct 16 -inch ductile <br />5. <br />Iron Pipe Water Main <br />LS <br />1 <br />()North of SA-5yault$ <br />6. <br />Construct Connections to <br />Existig12"/16"Mains <br />EA <br />4 <br />7. <br />Construct New Fleur Cnntrot <br />VauftanclAppurtenances <br />LS <br />1 <br />$ X23 rr <br />--�----�-� <br />$ Thi t13 0D.- <br />� <br />Cc�nstraact Modif'mtiailst0 <br />8, <br />the Existing SA -5 Meter <br />is <br />1 <br />Vault <br />9. <br />Construct Electrical and <br />Field Instrumentation <br />L5 <br />1 <br />2 <br />$ _ �� �u. <br />1t1. <br />Furnish instrumentation and <br />Programming <br />LS <br />1 <br />mW. <br />$ le y c, - <br />* 1 ut OO , <br />11. <br />Construct4-Inch fire Service <br />EA <br />1 <br />$ r} <br />$ r# <br />P-1 OF P-16 <br />23A-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.