My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
04/02/2019
>
FULL PACKET_2019-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 3:26:17 PM
Creation date
3/29/2019 3:24:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/2/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 11-6413 <br />SA -5 VAULT MODIFICATIONS <br />Item Old Item Unit Qty UnItPrice Amount <br />26." Potholes EA is 00$ y C3Ctf3 <br />27. Dewatering L5 I <br />$m ?�t�i>tI_ $ ?+s inti <br />28. Pe nits ES 1 $20,000 $20,000 <br />29. LaborAileementOversight IS 1 $25,0()0 $25,000 <br />TOTALBID $ <br />The lovmst responsible bidder shall be selected based on the total base bid. The City reserves the right to river d the Base <br />8W, and arry, all, or rave of the add -alternate biditems (if a rry). <br />Moiallization/DemoWiaation bid item Is lirnited to a maximurn of 5% of the Total Bid. <br />The quantity fet this bud iter is shown forbid comparison only. This Lid item shall not be subject to the °25%0 lithit <br />as stated in Section 3-2 of the Standard Speci Rcations. The actual amount for this item will be dictated by the actual <br />quantity used, and the, Agency resen-es the right to increase at decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />Bidder SIgTature must be shown on same oae as total bid amount shown €,n table) <br />The undersigned bidder hereby Proposes to complete the Work for the total base bid amount shown <br />above, within one hundred fifty {TSCI) working days alter the commencement date stated in the <br />Notice to Proceed. <br />10 — Working days for exploratory potholing and data gathering <br />It 140— Working days for project construction <br />The bidder also proposes to commenceconstruction of the Work within thirty (30) days after issuance <br />of a Notice to Proceed, and to continue in a diluent and workman -like manner without interruption, <br />and to complete the construction thereof within the time specified above. <br />The liquidated damages amount in Niers of the amount specified in Subsection 6-3 of the Standard <br />Specifications, shall be $1,000 per calendar day. <br />Name of Firm <br />Signature of BIDDER <br />Title Pi`s's% <br />{if an individual, so state} <br />P-3 4F P-16 <br />23A-12 <br />`y • o <br />
The URL can be used to link to this page
Your browser does not support the video tag.