My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-13-18 PC AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
08-13-2018
>
08-13-18 PC AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 4:19:59 PM
Creation date
4/8/2019 4:17:45 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2018-xx <br />Page 6 of 6 <br />8. The permit Applicant shall ensure that lessee or other user(s) shall comply with <br />the terms and conditions of this permit, and shall be responsible for the failure of <br />any lessee or other users under the control of permit Applicant to comply. <br /> <br />9. The major wireless facility shall be subject to any applicable California Building <br />Code or federal requirements for seismic safety, retrofit, and/or upgrades as <br />deemed necessary by the Building Division. <br /> <br />10. Conditional Use Permit No. 2018-14 expires 10 years from the date of Planning <br />Commission approval. <br /> <br /> <br /> <br />1-10
The URL can be used to link to this page
Your browser does not support the video tag.