My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-24-18_FULL PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
09-24-2018
>
09-24-18_FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 4:48:01 PM
Creation date
4/8/2019 4:42:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17-3881-1 <br /> Tustin Avenue Retail, Santa Ana <br />N:\3800\2173881 - Tustin Avenue Retail, Santa Ana\Report\3881 - Tustin Avenue Retail, Santa Ana TIA 03-13-18.doc <br /> <br />41 <br />TABLE 13-2 <br />EXISTING PLUS PROJECT ROADWAY SEGMENT LEVEL OF SERVICE SUMMARY <br />Key Roadway Segment <br />(1) <br /> <br />No. of <br />Existing <br /> Lanes <br />(2) <br /> <br /> <br />Arterial <br />Classification <br />(3) <br />Existing <br />Capacity <br />at LOS <br />āEā <br />(4) <br />Existing <br />Traffic Conditions <br />(5) <br />Existing Plus Project <br />Traffic Conditions <br />Daily <br />Volume <br />V/C <br />Ratio LOS <br />Daily <br />Volume <br />V/C <br />Ratio LOS Increase <br />Impact <br />(Yes/No) <br />A. Tustin Avenue, between <br />Fourth Street and First Street 5D Major 46,90012 17,315 0.369 A 18,153 0.387 A 0.018 No <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />12 Major 5-lane LOS E capacity was interpolated between Major 6-lane and Primary 4-lane arterials. <br />2-119
The URL can be used to link to this page
Your browser does not support the video tag.