My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 - MND 2016-156; GPA 2018-05; AA 2018-08
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
09-24-2018
>
2 - MND 2016-156; GPA 2018-05; AA 2018-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 4:51:54 PM
Creation date
4/8/2019 4:48:55 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17-3881-1 <br />Tustin Avenue Retail, Santa Ana <br />N:\3800\2173881 - Tustin Avenue Retail, Santa Ana\Report\3881 - Tustin Avenue Retail, Santa Ana TIA 03-13-18.doc <br /> 5 <br />3.0 EXISTING CONDITIONS <br />3.1 Existing Street System <br />The principal local network of streets serving the project site includes Fourth Street, First Street, and <br />Tustin Avenue. The following discussion provides a brief synopsis of these key area streets. The <br />descriptions are based on an inventory of existing roadway conditions. <br />Fourth Street is a six-lane, divided roadway oriented in the east-west direction that borders the <br />Project site to the north. The posted speed limit on Fourth Street is 40 miles per hour (mph). On- <br />street parking is not permitted along this roadway in the vicinity of the project. A traffic signal <br />controls the study intersection of Fourth Street at Tustin Avenue. <br />First Street is a four to six-lane, divided roadway oriented in the east-west direction that provides <br />two or three lanes in each direction separated by a raised median island. The posted speed limit on <br />First Street is 40 mph. On-street parking is not permitted along this roadway. A traffic signal <br />controls the study intersections of First Street at Tustin Avenue. <br />Tustin Avenue is a five-lane, divided roadway, oriented in the north-south direction. On-street <br />parking is permitted along the west side of the roadway in the vicinity of the Project. The posted <br />speed limit on Tustin Avenue is 40 mph. Traffic signals control the study intersections of Tustin <br />Avenue at Fourth Street and First Street. <br />Figure 3-1 presents an inventory of the existing roadway conditions for the arterials and <br />intersections evaluated in this report. This figure identifies the number of travel lanes for key <br />arterials, as well as intersection configurations and controls for the key area study intersections. <br />3.1.1 Public Transit <br />Public transit bus service is provided in the project area by the Orange County Transportation <br />Authority (OCTA). Two (2) OCTA bus routes operate within the vicinity of the Project site on First <br />Street, Fourth Street and Tustin Avenue, which consist of the following: <br /> OCTA Route 64 (Huntington Beach to Tustin): Route 64 is a community bus route serving the <br />Cities of Huntington Beach, Westminster, Garden Grove, Santa Ana and Tustin. The major <br />routes of travel include Bolsa Avenue, First Street and Newport Boulevard. Nearest to the project <br />site are bus stops on First Street - eastbound and westbound of the intersection with Tustin <br />Avenue. Route 64 operates on approximate 30-minute headways during weekdays and 20-minute <br />headways on weekends. <br /> OCTA Route 71 (Newport Beach to Placentia): Route 71 is a community bus route serving the <br />Cities of Newport Beach, Costa Mesa, Irvine, Tustin, Santa Ana, Orange, Anaheim and <br />Placentia. The major routes of travel include Newport Boulevard, Red Hill Avenue, Newport <br />Avenue, First Street, Tustin Avenue and Rose Avenue. Nearest to the project site are bus stops <br />on Tustin Avenue at the intersections with First Street and Fourth Street. Route 71 operates on <br />approximate 30-minute headways during weekdays and 45-minute headways on weekends. <br />2-67
The URL can be used to link to this page
Your browser does not support the video tag.