My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2019-05_2701 N GRAND AVENUE
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2019
>
RESO 2019-05_2701 N GRAND AVENUE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 3:07:09 PM
Creation date
4/10/2019 3:07:00 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Conditions of Approval for Variance No. 2018-12 <br />Variance No. 2018-12 to allow a reduction in required landscape setbacks and driveway <br />distances from an intersection is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with applicable sections of the Santa Ana Municipal <br />Code, the California Administrative Code, the California Building Standards Code, and all <br />other applicable regulations. In addition, they shall meet the following conditions of <br />approval: <br />The Applicant must comply with each and every condition listed belowrip or t0 exercising <br />the rights conferred by this variance. <br />1. All proposed site improvements must conform to the Site Plan Review (DP No. 2017-33) <br />and the staff report exhibits. <br />2. Any amendment to this variance must be submitted to the Planning Division for review. <br />At that time, staff will determine if administrative relief is available or the variance must <br />be amended. <br />3. Prior to the issuance of a building permit, a full landscape and irrigation plan is to be <br />submitted for review and approval. The landscape plan shall conform to the commercial <br />landscape standards, Citywide Design Guidelines, and the City's Water Efficient <br />Landscape Ordinance, and shall feature a berm to assist with screening the drive- <br />through lane from view. <br />4. Prior to the issuance of a building permit, a Property Maintenance Agreement must <br />be recorded against the property. The agreement will be subject to review and <br />applicability by the Planning and Building Agency, the Community Development <br />Agency, the Public Works Agency, and the City Attorney to ensure that the property <br />and all improvements located thereupon are properly maintained, Developer (and the <br />owner of the property upon which the authorized use and/or authorized improvements <br />are located if different from the Applicant) shall execute a maintenance agreement <br />with the City of Santa Ana which shall be recorded against the property and which <br />shall be in a form reasonably satisfactory to the City Attorney. The maintenance <br />agreement shall contain covenants, conditions and restrictions relating to the <br />following: <br />(a) Compliance with operational conditions applicable during any period(s) of <br />construction or major repair (e.g., proper screening and securing of the <br />construction site; implementation of proper erosion control, dust control and noise <br />mitigation measure; adherence to approved project phasing etc.); <br />Resolution No. 2019-05 <br />Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.