My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2019-08_2250 E 17TH STREET
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2019
>
RESO 2019-08_2250 E 17TH STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 3:07:25 PM
Creation date
4/10/2019 3:07:21 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Conditions of Approval for Conditional Use Permit No. 2019-06 <br />Conditional Use Permit No. 2019-06 for drive-through window service is approved <br />subject to compliance, to the reasonable satisfaction of the Planning Manager, with <br />applicable sections of the Santa Ana Municipal Code, the California Administrative Code, <br />the California Building Standards Code, and all other applicable regulations. In addition, <br />the Applicant shall meet the following conditions of approval: <br />The Applicant must comply with each and every condition listed belowrip or t0 exercising <br />the rights conferred by this conditional use permit. <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />1. All proposed site improvements must conform to Development Project Review (DP No. <br />2018-16) and the staff report exhibits. <br />2. Any amendment to this conditional use permit must be submitted to the Planning <br />Division for review. At that time, staff will determine if administrative relief is available or <br />the conditional use permit must be amended. <br />3. Prior to the issuance of a building permit, a full landscape and irrigation plan is to be <br />submitted for review and approval. The landscape plan shall conform to the <br />commercial landscape standards, Citywide Design Guidelines, and the City's Water <br />Efficient Landscape Ordinance, and shall feature a berm to assist with screening the <br />drive-through lane from view. <br />4. Prior to the issuance of a building permit, a Property Maintenance Agreement must <br />be recorded against the property. The agreement will be subject to review and <br />applicability by the Planning and Building Agency, the Community Development <br />Agency, the Public Works Agency, and the City Attorney to ensure that the property <br />and all improvements located thereupon are properly maintained, Applicant (and the <br />owner of the property upon which the authorized use and/or authorized <br />improvements are located if different from the Applicant) shall execute a <br />maintenance agreement with the City of Santa Ana which shall be recorded against <br />the property and which shall be in a form reasonably satisfactory to the City <br />Attorney. The maintenance agreement shall contain covenants, conditions and <br />restrictions relating to the following: <br />(a) Compliance with operational conditions applicable during any period(s) of <br />construction or major repair (e.g., proper screening and securing of the <br />construction site; implementation of proper erosion control, dust control and <br />noise mitigation measure; adherence to approved project phasing etc.); <br />Resolution No. 2019-08 <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.