My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2019-09_1703 E 17TH STREET (CUP NO. 18-27)
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2019
>
RESO 2019-09_1703 E 17TH STREET (CUP NO. 18-27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 3:07:32 PM
Creation date
4/10/2019 3:07:26 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Prior to Building Division plan check submittal, the Applicant shall submit a technical <br />noise study prepared by a professional firm specializing in preparation of noise studies <br />to the City for review by the Planning Division, Police Department, and Code <br />Enforcement Division that demonstrates that the proposed design and equipment of <br />the car wash will conform to City noise ordinances and will minimize noise impacts on <br />adjacent properties. The Applicant shall, to the best of his or her abilities and at his or <br />an updated and revised noise study based on updated field measurements within one <br />(1) month of commencement of operations, and again on the one-year anniversary of <br />the commencement of operations, to ensure compliance with the City's noise <br />ordinances. <br />2. Prior to the issuance of a building permit, a full landscape and irrigation plan is to be <br />submitted for review and approval. The landscape plan shall conform to the <br />commercial landscape standards, Citywide Design Guidelines, and the City's Water <br />Efficient Landscape Ordinance, and shall feature a berm to assist with screening the <br />vacuum areas from view. The plan shall be designed to preserve the existing mature <br />trees on the property edges where possible. The landscape plan shall also include a <br />solid, minimum eight -foot block wall on the north and east sides of the property, except <br />where openings are required for egress purposes. Lights facing the alley shall be <br />installed at regular intervals along the portion of the block wall across the northern <br />property line to illuminate the alley. The lights shall be designed to illuminate the alley <br />up to an eight -foot level and shall be designed to eliminate light intrusion into the <br />neighboring residential land uses. <br />3. Prior to release of Certificate of Occupancy, a traffic signal shall be constructed in full <br />accordance with City of Santa Ana standards and the letter dated February 21, 2019 <br />attached as Exhibit B to this Resolution at the intersection of Mabury and Seventeenth <br />streets. The traffic signal shall be installed without any cost to the City or <br />reimbursement to the Applicant and is to be fully funded, including any and all required <br />and related improvements, by the developer. <br />4. Prior to the issuance of a building permit, a Property Maintenance Agreement must <br />be recorded against the property. The agreement will be subject to review and <br />applicability by the Planning and Building Agency, the Community Development <br />Agency, the Public Works Agency, and the City Attorney to ensure that the property <br />and all improvements located thereupon are properly maintained, Developer (and <br />the owner of the property upon which the authorized use and/or authorized <br />improvements are located if different from the Applicant) shall execute a <br />maintenance agreement with the City of Santa Ana which shall be recorded against <br />the property and which shall be in a form reasonably satisfactory to the City <br />Resolution No. 2019-09 <br />Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.