My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARNAZ ENGINEERING CONTRACTORS, INC. (4)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARNAZ ENGINEERING CONTRACTORS, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 8:25:44 AM
Creation date
5/1/2019 11:23:27 AM
Metadata
Fields
Template:
Contracts
Company Name
ARNAZ ENGINEERING CONTRACTORS, INC.
Contract #
19-6495
Agency
Public Works
Council Approval Date
2/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 2 <br />First Street Undercrossing Stormwater Lift Station (19-6495), bidding on November 1, 2018 <br />2:00 PM (Pacific) <br />Printed 11/07/2018 <br />EXHIBIT A <br />Bid Results <br />Type <br />Item Code <br />UOM <br />City <br />Unit Price <br />Line Total Comment <br />4 <br />PCC Curb & Gutter (A-2-8) <br />LF <br />60 <br />$100.00 <br />$6,000.00 <br />5 <br />PCC Curb (B-1) <br />LF <br />30 <br />$100.00 <br />$3,000.00 <br />6 <br />PCC Swale (T=4") <br />SF <br />900 <br />$12.00 <br />$10,800.00 <br />7 <br />PCC Sidewalk (T=4") <br />SF <br />80 <br />$50.00 <br />$4,000.00 <br />8 <br />PCC Driveway Approach (T=8") <br />SF <br />230 <br />$50.00 <br />$11,500.00 <br />9 <br />PCC Driveway (T=8") <br />SF <br />1500 <br />$60.00 <br />$90,000.00 <br />10 <br />PCC Catch Basin (Type "B") <br />EA <br />5 <br />$15,000.00 <br />$75,000.00 <br />11 <br />Remove Existing Tree <br />EA <br />10 <br />$2,000.00 <br />$20,000.00 <br />12 <br />Demolish Existing Stair Assembly <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />13 <br />Demolish Existing Gravity Discharge Box <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />14 <br />Demolish Existing Pipe <br />LS <br />1 <br />$5,000.00 <br />$6,000.00 <br />15 <br />Furnish and Install 12" Cement -Lined Cast Iron <br />Pipe <br />LS <br />1 <br />$25,000.00 <br />$25,000.00 <br />16 <br />Furnish and Install 3" Cement -Lined Cast Iron <br />Pipe <br />LS <br />1 <br />$8,000.00 <br />$8,000.00 <br />17 <br />Furnish and Install Clarifier and Pipe <br />LS <br />1 <br />$25,000.00 <br />$25,000.00 <br />18 <br />Furnish and Install Full -Matrix LED Traffic Calming Sign System <br />LS <br />1 <br />$18,000.00 <br />$18,000.00 <br />19 <br />Lift Station <br />LS <br />1 <br />$200,000.00 <br />$200,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.