My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - PRE-LOAN_COMMITMENT_2019-01-15
Clerk
>
Agenda Packets / Staff Reports
>
Housing Authority (1999 - Present)
>
2019
>
01/15/2019_Special Mtg
>
3 - PRE-LOAN_COMMITMENT_2019-01-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 8:25:12 AM
Creation date
1/16/2019 9:33:07 AM
Metadata
Fields
Template:
City Clerk
Agency
Community Development
Item #
3
Date
1/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commitment of Affordable Housing Funds, a Lease and PBVs to HomeAid <br />January 15, 2019 <br />Page 3 <br />After the deadline, staff conducted a minimum threshold review of each proposal to ensure the <br />proposal complied with all of the minimum requirements in the RFP. Following the minimum <br />threshold review, staff formed a Review Panel that consisted of the Executive Director of the <br />City's Public Works Agency with his designee, the Executive Director of the Planning and <br />Building Agency with his designee, the Executive Director of the Community Development <br />Agency, and the Housing Division Manager. The Veterans Affairs Medical Center of Long <br />Beach, the County of Orange, Keyser Marston Associates, and MDG Associates served as <br />advisors to the Review Panel. <br />In compliance with the City's Affordable Housing Funds Policies and Procedures, the Review <br />Panel used the proposal Scoring and Selection Criteria from the RFP to conduct their review and <br />analysis of each proposal. In addition to the Scoring and Selection Criteria from the RFP, the <br />Review Panel also reviewed the proposed project design for appropriateness for the proposed <br />target group, compatibility with surrounding uses, cost effectiveness of construction, and <br />appropriateness of the design and construction for low maintenance and long term durability. <br />On October 30, 2018, the Review Panel met and interviewed all of the developers who submitted <br />a proposal. LINO Housing requested to be removed from consideration prior to their scheduled <br />interview and therefore their proposal was removed from consideration, On November 14, 2018, <br />the Review Panel met a second time to discuss and deliberate upon the scoring and selection of <br />the proposals. Following this deliberative selection process, the Review Panel agreed upon the <br />final scores below based on an average of the Individual Reviewer Scores: <br />3-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.