My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ SLURRY SEAL 1ST & RAITT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/07/2019
>
23A - PROJ SLURRY SEAL 1ST & RAITT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 6:14:58 PM
Creation date
5/2/2019 6:02:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
5/7/2019
Destruction Year
2024
Document Relationships
ALL AMERICAN ASPHALT (20)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NOS.: 19-6921 AND 19-6945 <br />FIRST ST. AND RA1TT ST. SLURRY SEAL AND RESURFACING <br />Item <br />Description <br />Qty <br />Unit <br />UnitPrice <br />Amount <br />15 <br />Adjust Water Valve Frame & Cover to <br />Finished Grade <br />7 <br />EA <br />$ '150-60 <br />16,650-00 <br />16 <br />Adjust Survey Monument Frame and Cover <br />to Finished Grade <br />I <br />EA <br />$ 0 63 OQ <br />0 v�U <br />$ Fbe Q0 <br />u <br />17 <br />Famish and Install New N6 Pull Box <br />7 <br />EA <br />$ 5g3.00 <br />131801.00 <br />18 <br />Protection of Surface Utility Collars, <br />Frames & Covers (First St) <br />I <br />LS <br />$ 1lW (►11 1 .00 <br />$ GO/1AI OO <br />I) <br />19 <br />Protection of Surface Utility Collars, <br />Frames & Covers (Raiff St) <br />1 <br />LS <br />$ <br />I O6 <br />99�.Uo <br />$ 99.00 <br />Temporary Construction Sign <br />4 <br />EA <br />$ I t �15 00 <br />OWA2120 <br />IOWA - <br />I <br />21 <br />Project Advertisement Sign <br />4 <br />EA <br />I Iffoo <br />I Vlg6Q.Go <br />22 <br />Furnish and Install Traffic Loops Type D t <br />21 <br />EA <br />$ go .Q o <br />$ 51 A60. 00 <br />23 <br />Furnish and Install Traffic Loops Type E t <br />55 <br />EA <br />$ 1f) <br />$l W1cUv,00 <br />24 <br />Furnish and Install Bicycle Loops Type Q t <br />1 <br />3 <br />EA <br />$ rl n (fo <br />W Q) U <br />$ q ff aO <br />V <br />25 <br />Signing and Striping (No Bike Lane) (First <br />I <br />LS <br />$ AN -60 <br />$��I 80v oa <br />0 <br />26 <br />Signing and Striping (Raitt Street) <br />I <br />LS <br />$4700,M <br />$ag1706.66 <br />27 <br />Labor Agreement Oversight <br />1 <br />LS <br />S 15,000 <br />S 15,000 <br />P-2 of P-17 <br />23A-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.