My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ SLURRY SEAL 1ST & RAITT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/07/2019
>
23A - PROJ SLURRY SEAL 1ST & RAITT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 6:14:58 PM
Creation date
5/2/2019 6:02:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
5/7/2019
Destruction Year
2024
Document Relationships
ALL AMERICAN ASPHALT (20)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />Cityof Santa Ana <br />Page 3 <br />First Street Slurry Seal and Resurfacing; Raltt Street Slurry Seal and Resurfacing (19.6921 &1 M945), bidding on <br />Printed 03129/2019 <br />i <br />Bid Results <br />Type <br />•Item Code UOM qty <br />Unit Price <br />Llne Total Comment <br />19 <br />Protection of Surface Utility Collars, Frames & Covers (Ralit St) <br />LS 1 <br />$982.00 <br />$992.00 <br />20 <br />Temporary Construction Sign <br />EA 4 <br />$1,815.00 <br />$6,460.00 <br />21 <br />Project Advertisement Sign <br />EA 4 <br />$2,100.00 <br />$8,400.00 <br />. 22 <br />Furnish and Install Traffic Loops Type D t <br />' <br />EA 21 <br />............ .. ... ... ........ <br />$250.00 <br />.......... :...._.... .._ <br />$5,250.00 <br />... ....... <br />23 <br />Furnish and Install Traffic Loops Type E t <br />....... . <br />LS 55 <br />$223.00 <br />$12,265.00 <br />24 <br />Furnish and Install Traffic Loops Type Q t <br />• <br />EA 3 <br />$250.00 <br />$750.00 <br />25 <br />Signing and Striping (No Bike Lane) (First Street) <br />LS 1 <br />$44,800.00 <br />$44,600.00 <br />26 <br />Signing and SWping (RaM Street) <br />LS 1 <br />$24,700.00 <br />$24,700.00 <br />27 <br />Labor Agreement Oversight <br />LS 1 .,, <br />$15,000.00 <br />$15,000.00 <br />Subtotal <br />$739,596.00 <br />Add Alternative One <br />26 <br />Bike Lane Striping (First Street) <br />Ls 1 <br />$59,500.00 <br />$59,600.00 <br />Subtotal <br />$59,500.00 <br />Asterisk Notes (Per P3 of Specifications) • NOT part of Total Bid Calculation <br />29 <br />• = The quantity for this bid Item Is sham for bid comparison only. This bid Item shall not be subject to the '25%' limit as stated in Section 3-2 of <br />the Standard Specifications. <br />EA 0 <br />0 <br />0 <br />30 <br />t = This bid Item Is considered a Specialty Item per Section 23.2 of the Standard Specifications. <br />EA a <br />. . <br />0 <br />.. <br />0 <br />.. <br />Subtotal.. <br />0 .. <br />Total <br />$799,096.00 <br />PlanetBlds, Inc. <br />23A-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.