My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT WORK CENTER MOU
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/07/2019
>
80A - JOINT WORK CENTER MOU
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:33:23 AM
Creation date
5/2/2019 6:11:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
80A
Date
5/7/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
722
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1A <br />c. Reduces overhead costs for any one Partner by streamlining and sharing financial, <br />procurement, and facility costs; <br />d. Ensures that costs are appropriately shared by AJCC Partners by determining contributions <br />based on the proportionate use of the AJCC centers and relative benefits received, and <br />requiring that all funds are spent solely for allowable purposes in a manner consistent with <br />the applicable authorizing statutes and all other applicable legal requirements, including <br />the Uniform Guidance, and, <br />e. All parties will meet and confer regarding replacement, acquisition, cleaning and <br />maintenance of furnishings. <br />The parties consider this AJCC operating budget the master budget that is necessary to maintain <br />the SAWDB's high -standard AJCC. It includes the following cost categories, as required by <br />WIOA and its implementing regulations: <br />a. Infrastructure costs (also separately outlined below in the Infrastructure Funding <br />Agreement); <br />b. Career services; and <br />c. Shared services. <br />All costs must be included in the MOU, allocated according to the AJCC Partner's proportionate <br />use and relative benefits received, reconciled every six. (6) months against actual costs incurred, <br />and adjusted accordingly. The AJCC operating budget is expected to be transparent and negotiated <br />among Partners on an equitable basis to ensure costs are shared appropriately. All Partners must <br />negotiate in good faith and seek to establish outcomes that are reasonable and fair. All Partners <br />must adhere and reference the rules and regulations included in the executed Office Lease, attached <br />hereto as Attachment 5 and incorporated herein by reference. <br />12) INFRASTRUCTURE FUNDING AGREEMENT <br />The Infrastructure Funding Agreement (" IFA") contains the infrastructure costs budget that is an <br />integral component of the overall AJCC operating budget. The IFA is a mandatory component of <br />the local MOU, described in WIOA sec. 121(c) and 20 CFR 678.500 and 678.755. The IFA <br />contains the AJCC Comprehensive Infrastructure Budget, and Other System Cost Budget„ included <br />herein as Attachment 3 and incorporated herein by reference, that is an integral component of the <br />overall AJCC operating budget. The other component ofthe IFA is the Applicable Career Services, <br />attached herein as Attachment 3-1 and incorporated herein by reference, which includes the shared <br />operating costs and shared services. The overall AJCC operating budget includes the <br />Comprehensive Cost Allocation and Partner Contributions, attached herein as Attachment 4 and <br />incorporated herein by reference. <br />AJCC infrastructure costs are defined as non -personnel costs that are necessary for the general <br />operation of the AJCC, including, but not limited to: <br />a. Rental of the facilities; <br />b. Utilities and maintenance; <br />iN <br />FORAM <br />
The URL can be used to link to this page
Your browser does not support the video tag.