EXHIBIT I
<br />Within a reasonable time prior to the start of any on -site work, delivery of materials, equipment, or personnel, Contractor will submit to
<br />Owner lbe followings
<br />A- A complete set ofdrowiugs approved by Owner and subsequently by the City in which the Building is Icooled.
<br />B- A fully executed Indemnity Agreement (To Be Provided by Owner Upon Request).
<br />C- Certificate or Insurance in a fame approved by Owner executed by insurance camps nice acceptable to Owner,
<br />0- A fully exeected Notificalimh-Rules for Contractors (Tor Be Provided by Owner Upon Request),
<br />B- A job schedule ofthe work to be accomplished, detailed by trade.
<br />F- A complete list of all proposed Subcontractors and suppliers. Owner must approve all contractors and subcontractors before
<br />commencement o f their work.
<br />O- The name and phone number (including emergency phone numbers) orpersonnel who are authorized to represent the Contractor.
<br />3. No revisions or changes of any kind may be made to the canstrucliou plans previously approved by Owner without prior written consent of
<br />the Owner. Any proposed revisions or changes must he submitted to Owner In the form of a change order, for Owner's review and
<br />approval prior to commencement of such changes, Revisions or changes site ring the floor plan, base building systems, or building
<br />operations must be submitted, In writing, to the Owner for review and approval prior to commencement orwork•
<br />d. All of Contractor's work must be scheduled so that it in no way conflicts with, hiterferes with, or impedes die quiet and peaceful enloyment
<br />Of Other tenants or occupants of the Project, or with the progress of Owner's wart ar operations. Any work [list is in conflict will be
<br />rescheduled by the Contractor to such time as approved by Owner. Additionally, Owner shall have no liability for any costs or expenses
<br />Incurred by Contractor (or Tenanl) in connection with such rescheduling,
<br />d. Contractor and subecibscam, shall employ persons and means for the orderly progress of the work without Interruption on account of
<br />stdkes, work stoppages or similar causes of delay. Additionally, Owner shall have no liability for any costs or expenses Incurred by
<br />Contractor (or Tenant) in connection with such delays.
<br />6. Materials and tout storage will be limited to die areas for which access has been gr'omed.
<br />7. Clean-up and rubbish removal shall be provided by the Contractor ut Contractor's expense. Contractor must, on a daily basis, remove all
<br />ntbbish, surplus and waste material resulting horn tha performance of his work. At die request of Owner, Contractor shall reIacatc any
<br />materials causing an obstruction as directed by Omar. Contractor will not be allowed to pines a dampener an site on n continuous basis
<br />during construction.
<br />Important note: The placement and location ofrubbish dumpsters and bins must be approved in advance by Owner.
<br />8. In general, Owner will Interface with Contractor to the extent necessary for work to be completed within tie guidelines of project
<br />specifications and for the enforcement of building rules and regulations.
<br />9. Contractor will make arrangements for unloading, Nash removal and hoisting after normal working hours due to the local city noise
<br />ordinance. (No such activity will he allowed between the hours of 10:00 P.m, to 7:00 a.m.) At no time will tie Contractor be given
<br />exclusive reserved use of the freight elevator unless applied for by Contractor and approved by Owner. Contractor may be afforded access
<br />to loading dock space and hoisting facilities for limited use at itch time during normal working hours as is prearranged wilh Owner, or at
<br />other times, with the consent of Owner slid upon pnymcnt ofOwi er's prevailing ree for after-hours use slid access.
<br />to. Contractor will be afforded unloading areas as prearranged with Owner. All materials unloaded at these areas will be moved to an erce of
<br />use immediately and shall not be stored or used in a way which adversely impacts use of the Building.
<br />11. Contractor (and Tenanp will be responsible for the security of its own materials, equipment and work, and that of his subcontractors.
<br />Contactor will also be responsible ftw dum l9c caused by Contractor or its subcontractors to die Project, Building and/or tenant areas,
<br />including- but not limited to the loading dock and indoor and ouktuar public mans, freight elevators, etc. Any such damages wil be
<br />promptly repaired to the Owner's satisfaction at sale cost of Connector,
<br />12. Contractor will comply with all applicable codes, laws and Mgulatians pertaining to the wok or Contactor, Imilud lag all surety and health
<br />rcguladow. The Contractor shall supply the Owner wish a Master List a r all Hazarsluus Materials and Iheir Maleriul Solcty Onto Sheers
<br />IMSDS) upon delivery to the job alto.. A discussion will then ensue pertaining to the safe $nirage, hurdling anti use 01'tlsese niatel-hil , as
<br />well is the Contractor's eniergeney preparedness plan I'ur handling the containment and clean-up arpotential I IOZLOlaua bl starlet spills.
<br />13. Contractor will nut cnguge In any labor practice that may delay or odiowise Impact the work of Owner or any OLIM'contractor.
<br />Id. No base building syslems will be turned off or disengaged by C'onu'nctor or coy subcontractor without prior written approval rand
<br />supervision by a representative orovover or IS ']get'[. Said syslems include but are not limited to sprinklers, electrical cin:uits, sir -handling
<br />units, smoke bends and wmer supply. Building electrical power shut -downs are allowed, with the prior wi•itlen consent al' owilor, on
<br />Salwxinys between 10:00 p.m. and i:00 u.rn. Only A request for approval spoil be mad
<br />advance.. e to [Ito I'rnperty ivlsnnger at least ten (111) drys in
<br />$01 WO, Ir Ce der De—Ciq• efSenrn.our Lunre 4. [shibii U
<br />80A-169