|
2. Within a roe so nab le time prior to the start Of oily on -site work, delivery of materials, equipment, or personnel, Contractor will submit to
<br />Owner the following:
<br />A- A complete set ofdrawiugs approved by Owner and subsequently by the City In which the Building is luau ed.
<br />B- A fully exeOLlted Indemnity Agreement (To Be Provided by Owner Upon Request).
<br />C- Corti Flcate of Insurance in a forms approved by Owncr executed by Insurance tomph nice acceptable to Owner,
<br />D- A fhlly executed Notiiicolion-Rules for Contrnetors (To Be Provided by Owner Upon Request),
<br />E- A job schedule orthe work to be accomplished, detailed by trade.
<br />F. A complete list of all proposed Subcontractors and suppliers. Owner must approve ail contractors and subcontractors before
<br />commencement o f their work.
<br />ta- The name slid phone number (including emergency phone numbers) orpersonnal who are authorized to represent the Contractor.
<br />3. No revisions or changes of any kind may be made to the construction plans previously approved by Owner without prior written consent of
<br />die Owner, Any proposed revisions or changes must be submitted to Owner in the font) of a change order, fo' Owner's review and
<br />approval prior to commencement of such changes, Revisions or changes altering the floor plan, base building systems, or building
<br />operations must besubmitted, In writing, to the Owner forrevlew and approval prior to commencement of work.
<br />4. All of Contractor's work must be scheduled so that it in no way conflicts with, Interferes with, or impedes ate quiet and peaceful enjoyment
<br />of Other tenants or accuponts of tha Project, or with the progress of Owner's work or operations. Any work that is in conflict will be
<br />rescheduled by the Contractor to such time as approved by Owner, Additlonally, Owner sholI hove no liability For may costs or expenses
<br />Incurred by Contractor (or Tenant) in connection with such rescheduling.
<br />S. Contractor and subcontractors shall employ persons and means for the orderly progress of the work without Interruption on account of
<br />strikes, work stoppages or similar causes of delay, Additionally, Owner shut have no liability for any costs or expenses incurred by
<br />Contractor (orTenant) in connection with such delays.
<br />6. Materials laid tool storage will be limited to die areas for which access has been granted.
<br />7. Clean-up and rubbish removal shot] be provided by the Contractor At Contractor's expense. Contractor must, on a daily basis, remove all
<br />rubbish, surplus and waste material resulting from the performance of his work. At the request of Owner, Contractor shall rolooutc any
<br />materials causing an obstruction as directed by Owner, Contractor will not be allowed to place a dumpstcr on aite Oil a continuous basis
<br />during construction.
<br />Impotent note; The placement end location of rubbish dumpsters and bias must be approved in advance by Owner.
<br />8. In general, Owner will interface with Contractor to the extent necessary for work to be completed within the guidelines of project
<br />specifications and for the enforceuuent of building miss and regulations.
<br />9. Connector will make arrangements for unloading, trash removal and hoisting after normal working hours due to the local city noise
<br />ordinance. (No such activity will be allowed between the hours of 10:00 p,m. to 7:00 a.m.) Al no time will the Contractor be given
<br />exclusive reserved use ofthe freight elevator unless applied for by Conlractor End approved by Owner. Contractormay be afforded access
<br />to loading dock space mud hoisting facilities for limited use at such time during normal working hours as is prearranged with Owner, oral
<br />other times, with the consent or Owner and upon payment Of Owner's prevailing roe For alter -hours use and access.
<br />10. Controciorwill be afforded unloading areas as prearranged with Owner. All materials unloaded at these areas will be moved to an cell or
<br />use Immediately slid shall not be storod m• used in a wily which adversely impnets use of the Building.
<br />III Conmelor (and Tenant) will be responsible for [lie security of its Own materials, equipment and work, and that of his subcontractors.
<br />Caaumctor will also he responsible for damage caused by Contractor or its subcontractors to die Project, Building and/or tenant areas,
<br />including- but not limited to the loading dock and indoor and outdoor public gross, freight elevators, etc. Any such damages will he
<br />promptly repaired to the Owner's satisfaction at sole cost or, Comnuutor,
<br />12, Contractor will comply with all applicable codes, laws mad regulations pertaining to the work of Conu'ocu r, including all sofety end health
<br />regulaions. The Contractor shall supply the Owner with a Master List of all Hamdous Materials and their Material Salety Data Sheers
<br />(bl•S DS) upon delivery to the jub site. A discussion will then ensue penuining to the safe sttsrogo, bundling anti use al'lhese materials; ns
<br />well us the COnt'nclor's emergency preparedness plan for handling the containment And clean-up afpotentiol Ilazarulous Moturial spills.
<br />13. Contractor will not engage In oily labor practice that ]'toy delay Or otherwise Impact the work orOwner or any other Contractor.
<br />14. NO hose building systems will be honed all' or disengaged by Contractor or oily subcontractor without prior written approval and
<br />supervising by a represcntativu urOwner or its Agent. Said systems include but are not limited to sprinklers, electrical circuits, nir-hu oiling
<br />units, smuke fiends and water supply, Building electrical power Shut -downs tare allowed, with the prior written consent al'Oumher, on
<br />Smuixlays between 10:00 P.m. and 5:00 tun. Only. A request Ibr approval shall be made to the Pnhparty Mamiger lit lent ten I11f) drys bh
<br />advance.
<br />801IVCtrrr Curavr Ur-00ry ufSw4nrinn Lease .4- ErhO+ir I)
<br />80A-361
<br />
|