2, Within a reasonable time prior to the start of any on -site work, delivery of materials, equipment, or personnel, Contractor will submit to <br />Owner the following: <br />A- A complete set Of drawings approved by Owner and subsequently by the City In which the Building Is located. <br />B- A fully executed Indemnity Agreement (To Be Provided by Owner Upon Request). <br />C- Cart! flcate of Insurance Ina form approved by Owner executed by Insurance companies acceptable to Owner. <br />D- A fully executed Not! flout ion -Rules for Contractors (To Be Provided by Owner Upon Request). <br />g- Ajob sell aduleofthe work tobeaccomplished, detailed bytrade. <br />F, A complete list of all proposed Subcontractors and suppliers, Owner must approve oil contractors and subcontractors before <br />commencement o f (heir work. <br />0- The name and phone number (including emergency phone numbers) orpersonnel who are authorized to represent ilia Contractor. <br />3. No revisions or changes of any kind may be made to the construction plans previously approved by Ovmer without prior written consent of <br />die Owner. Any proposed revisions or changes must be Submitted Lo Owner In the form of a change order, for Owner's review and <br />approval prior to commencement of such changes. Revisions or changes Shoring the floor plan, base building systems, or building <br />operations must besubinitted, In writing, to the Owner for review and approvnt prior to commencement of work, <br />4. All of Contractor's work must be scheduled so that it in no way conflicts with, interferes wills, or impedes the quiet and peaceful enjoyment <br />of other tenants or occupants of the project, or with the progress or Owner's work or operations, Any work that is in conflict will be <br />rescheduled by the Contractor to such time as approved by Owner. Additionally, Ovmcrsholl have no liability for any costs or expenses <br />Incurred by Contractor (or Tenant) in connection with such rescheduling. <br />6. Contractor and subcontractors shall employ persons and means for the orderly progress of the work without Interruption on account of <br />strikes, work stoppages or similar causes of delay, Additionally, Owner shall have no liability for any costs or expenses incurred by <br />Contractor (or Tenant) In connection with such delays. <br />6. Materials slid tool storage will be limited to the areas for which access has been granted. <br />7. Clean-up and rubbish removal shall be provided by the Contractor ut Contractor's expense. Contractor must, on a dally basis, remove all <br />rubbish, surplus and waste material resulting from the performance of his work. At die request of Owner, Contractor shall relocate any <br />materials causing an obstruction as directed by Owner. Contractor will not be allowed to place a dumpstcr on site on a continuous basis <br />during construction. <br />Important note: The placement and location ormbbish lampstors and bins must be approved In advance by Owner. <br />S. In general, Owner will Interface with Contractor to the extent necessary for work to be completed within Ore guidelines of project <br />specifleadous and for the enforcement o f building rules and regulations. <br />2 Connector will make arrangements far unloading, trash removal and hoisting after normal working hours due to the local OILY raise <br />ordinance. (No such activity will be allowed between the hours of Io:00 p.m. to 7:00 o.m,) At no time will the Contractor be given <br />exclusive reserved use of the freight elevator unless applied for by Contractor and approved by Owner. Contractor may be afforacd access <br />to loading clock space and hoisting facilities far limited use at such time during normal working hours as is prearranged with Owner, or at <br />other times, with the consent of Owner and upon payment of Owner's prevailing fee for after-hours use slid access. <br />10. Canmoctor will be aftbrded unloading areas us prearranged with Owner. All materials unloaded at these areas will be moved to an aren of <br />Oise lahncdiutely and atoll not ba stored or used in away which udversely impacts useofthe Building. <br />11. Contractor (and Tenanq will be responsible Ihr the security Grits own materials, equipment and work, and that of his subcontractors. <br />Contractor will also he responsible for damage caused by Contractor or its subcontractors to the Project, Building and/or tenant areas, <br />Including. but not limited to the loading dock and indoor and outdoor public areas, freight elevators, etc. Any such damages will he <br />promptly repaired to the Omer's satisfaction at sole cost of Contractor. <br />12, Contractor will comply with all applicable codes, laws and regulations pertaining to the work or, ConuacLur, including all Rarely and health <br />regulations. The Contractor shall supply ilia Owner with a Master List of all Hazardous Materials and (hell* Materiul SANLy Data Shelia <br />(bISDS) upon delivery to the job site. A discussion will then ensue pertaining to the Rude suxuge, handling and Use Of fliese materials, as <br />well us Lbe Contractor's emergency pruporedaess plan for Imndiing the Containment slid clean-up afpntentinl IIWAI IOus Material spills, <br />13. Contractor will not cnguge in shy labor practice that may delay or otherwise Impact the work of Ownci ar any other Commuter. <br />I4. No base building sysienhs will be turned oil' or disengaged by C•unti'actur or any subcontractor without prior writen approval nod <br />supervision by u representative orOwner or ds agent. Said Systems include but are not I(miied Lo sprinklers, electrical circuits, air -handling <br />tells, smoke beads and wafer supply. Building electrical power shut -downs are allowed, with the prior written consent ol'Owaer, kill <br />saiunlays between 10:00 prat and 5t00 a.m. only, A request far approval shall be made to the Property Manager w least ten 1101 days in <br />advance. <br />rib! rV Ctrrr fanrurUr—CiryvrfSunla Amu Lease -4- Rxhibir D <br />80A-552 <br />