My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT WORK CENTER MOU
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/07/2019
>
80A - JOINT WORK CENTER MOU
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:33:23 AM
Creation date
5/2/2019 6:11:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
80A
Date
5/7/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
722
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B -- OUTLINE SPECIFICATIONS <br />DIVISION 1 <br />6. All equipment and appliances provided by Lessor shall be Energy Star -labeled if <br />Energy Star is applicable to the equipment or appliance. <br />7. Wherever restroom fixtures are replaced during construction, the California Green <br />Building Standards voluntary measures are to be met to achieve a further reduction in <br />water usage for state -leased space (Tier 1, 30 percent reduction minimum). Lessor to <br />implement annual irrigation system audits, including leak detection, and perform <br />immediate repairs to minimize any water loss. <br />8. Lessor to implement annual irrigation system audits, including leak detection, and <br />perform immediate repairs to minimize any water loss, <br />9. New and renegotiated state leases shall, when economically feasible, include <br />provisions for reporting water use and installation of sub -meters where appropriate. <br />N. Submittals: Lessor shall submit shop drawings of product data, as well as samples, to the <br />State for review prior to construction or fabrication. <br />0. Material Safety Data Sheet (MSDS): Prior to construction and upon request by the State, <br />Lessor shall provide MSDS of all products or materials used in the maintenance, repair or <br />renovation of the premises. <br />1.4 CONSTRUCTION AND CODE CRITERIA <br />A. Construction documents: The Exhibit "A" Plan or the Exhibit "A" Facility Design Program <br />(written narrative) are design development guidelines only. Lessor shall provide all <br />required construction documents and calculations necessary to obtain a building permit <br />from the local Building Department and to construct the improvements as indicated. The <br />use of the Exhibit "A" Plan in lieu of construction documents is not acceptable to the <br />State. <br />1. Prior to submitting construction documents to the local building department for plan <br />check or permitting, Lessor shall submit said construction documents to DGS for <br />review. Any DGS comments to the construction documents shall be construed as <br />advisory only and shall not relieve the Lessor in any respect from full compliance with <br />Exhibits "A," "B" and "C" or any other exhibits. <br />2. Lessor's architect, engineers, consultants, and contractors shall have current and <br />valid licenses/certifications Issued by the state of California. <br />3. During construction of building's core, shell, and/or tenant improvements, Lessor shall <br />maintain at the project site a complete set of lease exhibits consisting of Exhibits "A," <br />"B," "C" and any other exhibits for DGS use. <br />B. State Fire Marshal: Concurrent with submission to the building department for permitting, <br />Lessor shall submit a complete set of construction documents, including fire sprinkler <br />plans and fire alarm plans, to the State Fire Marshal for review and approval and shall <br />Rev. Maroh 2019 <br />80A-616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.