My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT WORK CENTER MOU
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/07/2019
>
80A - JOINT WORK CENTER MOU
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:33:23 AM
Creation date
5/2/2019 6:11:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
80A
Date
5/7/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
722
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 3 <br />EXHIBIT B — OUTLINE SPECIFICATIONS <br />DIVISION 1 <br />o) All miscellaneous metals <br />p) All other finish and construction materials <br />If any waste materials encountered during the demolition or construction phase are <br />found to contain lead, asbestos, polychlorinated biphenyls (PCBs) (such as <br />fluorescent lamp ballasts), or other harmful substances, they shall be handled and <br />removed in accordance with federal and state laws and requirements concerning <br />hazardous wastes. <br />6. In addition to providing "one-time" removal and recycling of large-scale demolition <br />items such as carpeting or drywall, the Lessor shall provide continuous facilities for <br />the recycling of incidental construction waste during the Initial construction. <br />7. Construction materials recycling records shall be maintained by the Lessor and shall <br />be accessible to the State. Records shall include materials recycled or landfilled; <br />quantity; date; and identification of hazardous wastes. <br />8. Leftover paint and open paint cans shall be returned to drop-off locations, paint <br />retailers, hardware stores, transfer stations and household hazardous waste facilities <br />for reuse, recycling or proper management. Unopened cans of paint shall be left on <br />site for the Lessor's or agency's use for touch-up painting. <br />1.6 SUBSTANTIAL COMPLETION AND PROJECT COMPLETION <br />A. Premises shall fully conform to all lease exhibits and shall be constructed in accordance <br />with industry standards and best practices. Lessor guarantees that all mechanical, <br />electrical, plumbing systems and other features (including architectural finishes, paint, <br />hardware, doors, floor covering, etc.) are of quality capable of giving satisfactory service <br />in accordance with these specifications for the term of this lease. <br />B. Substantial completion is achieved when the building core, shell, and tenant <br />improvements as defined in these lease exhibits, including the installation of any modular <br />systems furniture (MSF), are sufficiently completed to allow the State to lawfully and <br />physically occupy the premises for its intended purpose. Any work required to complete <br />any outstanding punch -list items shall not interfere with or interrupt the State's daily <br />operation. A DGS planner will make the final determination of when substantial <br />completion is achieved. <br />C. Lessor shall operate the HVAC system to provide continuous air for a minimum of 24 <br />hours per day for seven days prior to occupancy. <br />D. State employees, agents, and invitees shall have ready access to the building and <br />premises through the main building entry and lobby. Elevators, stairs and restrooms shall <br />be operational. <br />E. The premises shall be free of all construction debris and thoroughly cleaned. Lessor shall <br />touch up and restore damaged or defaced painted surfaces throughout the premises <br />subsequent to installation of State's furnishing and equipment. All painting shall be <br />coordinated with a DGS planner. <br />F. Upon project completion, Lessor shall obtain final approvals from the authorities having <br />jurisdiction and all punch -list items shall have been completed, and reinspected by the <br />State. Lessor shall submit to the State the following completed documents, if applicable, <br />with all appropriate signatures. <br />10 <br />Rev. March 2010 <br />80A-620 <br />
The URL can be used to link to this page
Your browser does not support the video tag.