My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT WORK CENTER MOU
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/07/2019
>
80A - JOINT WORK CENTER MOU
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:33:23 AM
Creation date
5/2/2019 6:11:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
80A
Date
5/7/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
722
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L=1:1113��3 <br />I�]►��E-y[•]�F�'�r.��yr:7:�rf:€3:11�7cria�1gT <br />D. A copy of the Permit Application form and all submittals shall be sent to: <br />Office of State Fire Marshal, Fire and Life Safety <br />2251 Harvard Street <br />Sacramento, California, 95815 <br />Contact telephone: (916)445-8550. <br />This form must be filled out completely, Including all Applicant and Building <br />Contractor information. Plan review time is typically 6 to 8 weeks; however, the <br />architect shall verify the estimated review time for this project review at submittal. <br />The architect shall make the necessary adjustments to the overall project schedule <br />accordingly. <br />E. The construction documents will be returned to the address shown under Applicant <br />Information, on the Permit Application and will be accompanied by either a SFM Plan <br />Review Approval or a SFM Plan Review Transmittal with a list of deficiencies. <br />Upon completion of plan review, the Lessor/architect shall provide a copy of the SFM <br />Plan Review Approval letter to the RESD Space Planner, <br />2.03 CONSTRUCTION INSPECTION <br />A. The regional SFM office will inspect and approve the construction in the State leased <br />building. There are two fire life safety regions; North and South. The final SFM <br />approved construction documents will include all inspection contact Information and <br />will be emailed via the GOVmotus website to the Lessor. To request a SFM <br />inspection for your site; provide a minimum of 24 to 48 hour notice prior to the <br />inspection date. The inspections must be requested on the GOVmotus website. The <br />Lessor, architect, or contractor shall be responsible for logging into the GOVmotus <br />website and requesting inspections. <br />B. After completion of each successive SFM construction inspection, any deficiencies <br />shall be recorded on the SFM Fire Safety Correction Notice by the SFM assigned <br />Deputy and emailed to the Lessor by the SFM. A copy of the inspection notice will <br />be immediately available on the GOVmotus wsbsite, This form is to be signed by a <br />Lessor's representative on site. Final approval by the Deputy SFM is recorded on <br />this document and a SFM Certificate of Occupancy is then issued. The Lessor or <br />Lessors contractor shall send a copy to the RESD Space Planner. <br />End of SFM Process <br />(Rev-9/99) <br />80A-647 <br />
The URL can be used to link to this page
Your browser does not support the video tag.