My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT WORK CENTER MOU
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/07/2019
>
80A - JOINT WORK CENTER MOU
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:33:23 AM
Creation date
5/2/2019 6:11:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
80A
Date
5/7/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
722
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 3 <br />DIVISION 4— REFERENCE FORMS <br />4.05 DVBE PROGRAM CERTIFICATION SHEET, FORM F <br />CALIFORNIA DISABLED VETERAN BUSINESS ENTERPRISE <br />PROGRAM CERTIFICATION SHEET <br />Lessor must complete and sign to certify if DVBE Participation was or was not <br />obtained <br />LEASE AMOUNT/DVBE CERTIFICATION Lease Project No.:142056 <br />I hereby certify that the Lease Contract Amount, as defined below, is in the amount of <br />of which $ was awarded to a certified <br />DVBE firm resulting in % DVBE participation, I understand that the Lease Contract <br />Amount is the total dollar figure against which the DVBE participation will be evaluated. <br />Lessor Name <br />Lessor's Signature <br />Date <br />Printed Name <br />DEFINITION: Lease contract amount is the total amount of lease costs expended by the <br />Lessor over the firm term of the lease which are attributable to expenditures by the lessor to <br />make the leased property sufficient for state occupancy. This typically includes, but is not <br />necessarily limited to, tenant improvements, extraordinary maintenance, and janitorial services <br />specified in the lease. In the case of a build -to -suit facility, the total of the construction and off - <br />site development costs, as well as architectural and engineering costs, would be included. <br />14 <br />(Rev-3110) <br />80A-656 <br />
The URL can be used to link to this page
Your browser does not support the video tag.