Laserfiche WebLink
EXHIBIT 1A <br />2. Within a reasonable lime prior to the start of any on -site work, delivery of materials, equipment, or personnel, Contractor will submit to <br />Owner the following: <br />A- A complete set of drnwiogs approved by Owner and subsequently by the City In which the Building Is located. <br />[4- A fully executed Indemnity Agreement (To Be Provided by Owner Upon Request). <br />C- Certificate of Insurance Ina form approved by Own or executed by Insurance camps nice acceptable to Owner, <br />D- A fully executed Notification -Rules fur Contractors (To Be Provided by Owner Upon Request). <br />B- A job schedule orthe work to be accomplished, detailed by trade. <br />P• A complete list of all proposed Subcontractors and suppliers. Owner must approve ail contractors and subcontractors before <br />commencement o f their work. <br />0- The name and phone number (including emergency phone numbers) orpersonnal who are authorized to represent Ilia Contractor. <br />3, No revisions or changes army kind may be made to the construction plans previously approved by Owner without prior written consent of <br />the Owner. Any proposed revisions or changes must be submitted to Omer in the form of a change order, for Ownm^s review and <br />Approval prior to commencement of such changes. Revisions or changes altering the floor plan, base building systems, or building <br />operations must be submitted, in writing, to the Owner forrevlew, and approval prior to commencement orwork• <br />4. AU of Contractor's work must be scheduled so that it in no way conflicts with, Interferes with, or impedes the quiet and peaceful enjoyment <br />of other tenants or occupants of the project, or with the progress of Owner's work or operations. Any work that is in con Blcl will be <br />rescheduled by the Contractor to auch time as approved by Owner, Additionally, Ovnnersholl have no [(ability for any costs or expenses <br />incurred by Contractor (or TenanI) in connection with such rescheduling. <br />5. Contractor and subcontmouirs shall employ persons and means for the orderly progress of the work without interruption on account of <br />strikes, work stoppages or sinaflar causes of delay, Additionally, Owner shall have no liability for any costs or expanses Incurred by <br />Contractor (or Tenarn) In connection with such delays. <br />6. Materials and tool storage will be limited to the areas for which access has been granted. <br />7. Clean-up and rubbish removal shall be provided by the Contractor or Contractor's expense. Contractor must, on u daily basis, remove all <br />rubbish, surplus and waste material resulting from the performance of his work. Al the request of Owner, Contractor shall relocate any <br />materials causing an obstruction as directed by Owner. Contractor will not be allowed to pines a dumpster on site on a continuous basis <br />during construction, <br />Important note: The placement and location orrubbish dompsters And hire must be approved in advance by Owner. <br />S. In general, Owner will Interface with Contractor to the extent necessary for work to be completed within Ore guidelines of project <br />specifications and for the enforeenient 0rbuilding rules and regulations. <br />9. Contractor will make arrangements for unloading, trash removal and hoisting after normal working hours due to the local city Arline <br />ordinance, (No such activity will be allowed between the hours of 10:00 p.m, to 7:00 a.m.) Al no time will the Conti -actor be given <br />exclusive reserved use afihe freight elevAtar unless applied for by Contractor and approved by Owner. Contractormay be afforded access <br />to [onding dock space and hoisting facilities far limbed use stanch time during normal working hours as is prearranged with Owner, or at <br />othertimes, with the consent ofOvvner pnJ upon paymcniorovmces prevailing toe forager -hours use and access. <br />to. Contractorwill be afforded unloading areas as prearrnngud with Omer. All materials unloaded at dsese areas will be moved to an twee of <br />use Inrmedlately and shall not be stored or used in away which adversely impacts use ofthe Building, <br />ill Contractor (and Tenant) will be responsible for the security Arita own materials, equipment and work, and that of his subcontractors. <br />Contractor will also be responsible for duninge caused by Contractor or its subcontractors to die Project, Building Lower [client areas, <br />including. but not limited to the loading dock and indoor and outdoor public areas, freight elevators, etc. Any such damages will he <br />promptly repaired to the Owner's satisfaction at sole cost of Contractor, <br />12, Contractor will comply with all applicable codes, laws and regulations pertnfning to the work ol'Conunclur, including all safety and health <br />regulations. The Contractor shell supply Ilia Owner with a Master List or all Haznrlous Materials and their Material Safety Date Sheets <br />(MSDS) upon delivery to lhejob site. A discussion will then ensue pertaining to the safe storage, handling and use ofthese materials, as <br />well as In Contractor's emergency preparedness plan Air handling the containment and cfeon-up of potential Nnzardous Matcrfat spills, <br />13. Contractor will not engage In any labor practice that may delay cur otherwise impact the work rf Owncr or Any other contractor. <br />14. No bass building systems will be turned oil' or disengaged by Cutil motor or any subcontractor without prior written approvnl and <br />Supervision by arepresentnlivuuromeroheagent. Said systems include but are not. limlledtosprinklers, electrical circuit,,nir-hundling <br />units, smoke heads and wmer supply. Building electrical power shut -downs are allowed, with the prior written consent oroiwner, on <br />Satunlays between 10:00 p,nt. and 5:00 a.m. only, A request for approval shall be made to the property Manager lit Inns[ ten ( (li) days in <br />advance. <br />W iVClrrr Confer•Br—Cie, af.SSmonlnrr Lewis -4- fixhibil D <br />80A-72 <br />