<br />2. Within a reasonable lime prior to the start of any on -site work, delivery of materials, equipment, or personnel, Contractor will submit to
<br />Owner the following:
<br />A- A complete set of drnwiogs approved by Owner and subsequently by the City In which the Building Is located.
<br />[4- A fully executed Indemnity Agreement (To Be Provided by Owner Upon Request).
<br />C- Certificate of Insurance Ina form approved by Own or executed by Insurance camps nice acceptable to Owner,
<br />D- A fully executed Notification -Rules fur Contractors (To Be Provided by Owner Upon Request).
<br />B- A job schedule orthe work to be accomplished, detailed by trade.
<br />P• A complete list of all proposed Subcontractors and suppliers. Owner must approve ail contractors and subcontractors before
<br />commencement o f their work.
<br />0- The name and phone number (including emergency phone numbers) orpersonnal who are authorized to represent Ilia Contractor.
<br />3, No revisions or changes army kind may be made to the construction plans previously approved by Owner without prior written consent of
<br />the Owner. Any proposed revisions or changes must be submitted to Omer in the form of a change order, for Ownm^s review and
<br />Approval prior to commencement of such changes. Revisions or changes altering the floor plan, base building systems, or building
<br />operations must be submitted, in writing, to the Owner forrevlew, and approval prior to commencement orwork•
<br />4. AU of Contractor's work must be scheduled so that it in no way conflicts with, Interferes with, or impedes the quiet and peaceful enjoyment
<br />of other tenants or occupants of the project, or with the progress of Owner's work or operations. Any work that is in con Blcl will be
<br />rescheduled by the Contractor to auch time as approved by Owner, Additionally, Ovnnersholl have no [(ability for any costs or expenses
<br />incurred by Contractor (or TenanI) in connection with such rescheduling.
<br />5. Contractor and subcontmouirs shall employ persons and means for the orderly progress of the work without interruption on account of
<br />strikes, work stoppages or sinaflar causes of delay, Additionally, Owner shall have no liability for any costs or expanses Incurred by
<br />Contractor (or Tenarn) In connection with such delays.
<br />6. Materials and tool storage will be limited to the areas for which access has been granted.
<br />7. Clean-up and rubbish removal shall be provided by the Contractor or Contractor's expense. Contractor must, on u daily basis, remove all
<br />rubbish, surplus and waste material resulting from the performance of his work. Al the request of Owner, Contractor shall relocate any
<br />materials causing an obstruction as directed by Owner. Contractor will not be allowed to pines a dumpster on site on a continuous basis
<br />during construction,
<br />Important note: The placement and location orrubbish dompsters And hire must be approved in advance by Owner.
<br />S. In general, Owner will Interface with Contractor to the extent necessary for work to be completed within Ore guidelines of project
<br />specifications and for the enforeenient 0rbuilding rules and regulations.
<br />9. Contractor will make arrangements for unloading, trash removal and hoisting after normal working hours due to the local city Arline
<br />ordinance, (No such activity will be allowed between the hours of 10:00 p.m, to 7:00 a.m.) Al no time will the Conti -actor be given
<br />exclusive reserved use afihe freight elevAtar unless applied for by Contractor and approved by Owner. Contractormay be afforded access
<br />to [onding dock space and hoisting facilities far limbed use stanch time during normal working hours as is prearranged with Owner, or at
<br />othertimes, with the consent ofOvvner pnJ upon paymcniorovmces prevailing toe forager -hours use and access.
<br />to. Contractorwill be afforded unloading areas as prearrnngud with Omer. All materials unloaded at dsese areas will be moved to an twee of
<br />use Inrmedlately and shall not be stored or used in away which adversely impacts use ofthe Building,
<br />ill Contractor (and Tenant) will be responsible for the security Arita own materials, equipment and work, and that of his subcontractors.
<br />Contractor will also be responsible for duninge caused by Contractor or its subcontractors to die Project, Building Lower [client areas,
<br />including. but not limited to the loading dock and indoor and outdoor public areas, freight elevators, etc. Any such damages will he
<br />promptly repaired to the Owner's satisfaction at sole cost of Contractor,
<br />12, Contractor will comply with all applicable codes, laws and regulations pertnfning to the work ol'Conunclur, including all safety and health
<br />regulations. The Contractor shell supply Ilia Owner with a Master List or all Haznrlous Materials and their Material Safety Date Sheets
<br />(MSDS) upon delivery to lhejob site. A discussion will then ensue pertaining to the safe storage, handling and use ofthese materials, as
<br />well as In Contractor's emergency preparedness plan Air handling the containment and cfeon-up of potential Nnzardous Matcrfat spills,
<br />13. Contractor will not engage In any labor practice that may delay cur otherwise impact the work rf Owncr or Any other contractor.
<br />14. No bass building systems will be turned oil' or disengaged by Cutil motor or any subcontractor without prior written approvnl and
<br />Supervision by arepresentnlivuuromeroheagent. Said systems include but are not. limlledtosprinklers, electrical circuit,,nir-hundling
<br />units, smoke heads and wmer supply. Building electrical power shut -downs are allowed, with the prior written consent oroiwner, on
<br />Satunlays between 10:00 p,nt. and 5:00 a.m. only, A request for approval shall be made to the property Manager lit Inns[ ten ( (li) days in
<br />advance.