My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - RESIDENTIAL/ALLEY IMPROV PROJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/21/2019
>
23A - RESIDENTIAL/ALLEY IMPROV PROJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:24:06 PM
Creation date
5/16/2019 4:19:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
5/21/2019
Destruction Year
2024
Document Relationships
EBS GENERAL ENGINEERING, INC
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 2 <br />Residential Street Repair Program and Alley Improvement FY 17118 (18.7526,1 &7527 & 18.6910), bidding on February Printed 0310112019 <br />Bid Results <br />Type <br />Item Code <br />UOM <br />OtY <br />Unit Price <br />Line Total Comment <br />3 <br />Aggregate Base <br />TN <br />100 <br />$45.00 <br />$4,500.00 <br />4 <br />Removal of 6" PCC at Various Locations <br />GY <br />1120 <br />$135.00 <br />$151,200.00 <br />5 <br />Construct 6" PCC Pavement with (3 -day) Cure including Dowels <br />Cy <br />1120 <br />$230.00 <br />$257,600.00 <br />6 <br />Crack Seal with Deere Super Gray <br />LF <br />30000 <br />$4.25 <br />$127,500.00 <br />7 <br />Construct PCC Sidewalk (T=4") <br />SF <br />6100 <br />$5.00 <br />$30,600.00 <br />8 <br />Construct PCC Driveway Approach (T=6")' <br />, <br />SF <br />900 <br />$7.00 <br />$6,300.00 <br />9 <br />Construct PCC Curb Ramp <br />SF <br />6000 <br />$11.00 <br />$86,000.00 <br />10 <br />Construct PCC Curb and Gutter (A-2.6) <br />LF <br />100 <br />$35.00 <br />$3,500.00 <br />11 <br />Construct PCC Curb and Gutter (B-1) <br />LF <br />400 <br />$35.00 <br />$14,000,00 <br />12 <br />Construct PCC Alley Apron (T=8") <br />SF <br />400 <br />$10,00 <br />$4,000.00 <br />13 <br />Construct PCC Alley (T=8") with (3 -Day) Cure <br />CY <br />160 <br />$330.00 <br />$52,800.00 <br />14 <br />Construct PCC Crass -Gutter (Local Street) <br />SF <br />2200 <br />$9.00 <br />$19,800.00 <br />15 <br />Grind PCC <br />LF <br />300 <br />$30.00 <br />$9,000.00 <br />16 <br />Root Shave <br />EA <br />16 <br />$400.00 <br />$6,400.00 <br />17 <br />Adjust Sewer Manhole Frame and Cover to Finished <br />Grade <br />EA <br />15 <br />$500.00 <br />$7,500.00 <br />18 <br />Fumish and Install Water Valve Frame and Cover to Grade <br />EA <br />15 <br />$850,00 <br />$9,750.00 <br />PlanetBlds, Inc. <br />23A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.