My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLACEWORKS, INC.
Clerk
>
Contracts / Agreements
>
P
>
PLACEWORKS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2022 12:51:07 PM
Creation date
5/22/2019 1:07:17 PM
Metadata
Fields
Template:
Contracts
Company Name
PLACEWORKS, INC.
Contract #
A-2019-064
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
5/7/2019
Expiration Date
11/5/2020
Destruction Year
2025
Notes
A-2018-077; A-2018-283;
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This scope does not include attendance at public meeting or hearings or response to public comments. <br />Should additional work be requested and needed, these would be billed in addition to the proposed scope <br />and budget. <br />TRAFFIC AND PARKING <br />The original proposal for walkable community gardens at these locations were expected to attract people in <br />the immediate neighborhood without generating traffic or parking demand. The skate facilities lighted to <br />allow evening use as late as 10 pm will change how the parks are used. We will observe other skate parks <br />within evening use to gain a projected traffic rate and reviewthis project in that context. <br />AIR QUALITY/GHG <br />The additional traffic generated by the skate facilities will require modification of construction emissions, <br />plus addition of auto -related emissions. <br />AESTHETICS/LIGHT AND GLARE <br />While we do not have lighting plans, the lights will be on stanchions tall enough to be visible from off -site <br />and adjacent residences. Daytime visual impacts will be evaluated along with light spillover and glare. We <br />prepare a lighting analysis showing spillover in foot-candles at the property line and visual simulations of the <br />two parks at two locations, each. We will work with the City to determine the appropriate light spillover <br />significance threshold, if a standard has not been established. <br />HYDROLOGY/WATER QUALITY <br />The environmental document will review hydrology and water quality impacts based on the project plans <br />and studies provided by the project engineer. This will include a description of drainage areas, stormwater <br />volumes and method of maintaining water quality via the bioswale, <br />CEQA/NEPA DOCUMENTATION <br />The CE0A1lnitial Study and the NEPA/Environmental Assessment will require modification, including project <br />description/graphics, alternatives (NEPA), etc. This will also require an additional review of the draft <br />documents by the City and Ni We are assuming that the analysis will conclude all impacts are less than <br />significant or less than significant with mitigation. <br />COST ESTIMATE <br />Table 1 presents our estimated cost to complete the additional work to revise the park projects to include <br />skate facilities. This assumes thatthatthe CEQA/NEPA clearance will remain with an IS/EA and an EIR/EIS will <br />not he necessary. If this changes, we will require an additional amendment to the budget. <br />Sincerely, <br />PIACEWORKS <br />Dwayne Mears, AICP <br />Principal <br />April 1, 2019 1 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.