Laserfiche WebLink
ER No. 2018-72, AA <br />Transformation Project <br />May 13, 2019 <br />Page 8 <br />No. 2018-04, DA No. 2018.02, & TPM No. 2018-01, — MainPlace <br />Community Commercial (C-1) zoning district. in addition to those uses, the C-2 zoning district <br />permits limited wholesale, research and development, equipment safes, car washes, trailer parks <br />and camps, thrift shops, food distribution centers, indoor swap meets, warehouse stores, and <br />superstores. These uses are permitted by -right or are subject to approval of a conditional use <br />permit. The existing C-2 zoning designation does not meet the goals and objectives of the project <br />to produce a dynamic mixed use village with residential, hotel, office, and commercial land uses. <br />SP•4 will ensure high -quality development at MalnPiace and maintains the General Plan's vision <br />for District Centers. According to the General Plan, District Centers are designed to serve as <br />anchors to the City's commercial corridors, and to accommodate major development activity. <br />District Centers are to be developed with an urban character that includes a mixture of high-rise <br />office, commercial, and residential uses which provide shopping, business, cultural, education, <br />recreation, entertainment, and housing opportunities. The Main Place/City Place District Center <br />includes a regional shopping center and office complex, as well as high intensity housing and <br />mixed -use development. The proposed Amendment Application (zone change) to establish a <br />Specific Plan (SP-4) zoning designation is consistent with the goals and objectives of the project <br />and is consistent with the goals and policies of the site's existing District Center (DC) General Plan <br />land use designation. <br />The proposed Specific Plan will establish permitted uses that will be permitted by right, subject to <br />a conditional use permit, or subject to a land use certificate. The uses are intended to create a <br />dynamic, mixed -use environment anchored by a central commercial mall and surrounded by <br />complementary land uses. These uses differ from those allowed by the existing C-2 zoning at the <br />site, which permit a broader range of commercial activities, many of which do not support the <br />stated goals and vision for the project site. Additional details are provided in Attachment 6. <br />Additional details on the core components of the Specific Plan are provided in Table 5, Project - <br />Specific Development Standards, below. <br />Table 5: Project -Specific Development Standards <br />fi5tanklard <br />Dqs"cii :�)abw . <br />Maximum Floor Area <br />2.1 (already permitted by the General Plan !_and Use Element) <br />Ratio FAR <br />Maximum Building <br />Mixed use, residential, hotel, and/or office: 10 stories maximum; 20 stories <br />Height <br />permitted along Main Street or subject to a Site Plan Review approval by the <br />Planning Commission <br />Parking structures: 6 levels maximum above -grade <br />Minimum Building <br />15 feet minimum from Main Street and Main Place Drive <br />Setbacks <br />Onsite Parking <br />Commercial (retail, service, restaurants, etc.): 3.5 spaces per 1,000 sq. ft. <br />gross floor area <br />75D-24 <br />