My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ER No. 2018-72, AA <br />Transformation Project <br />June 4, 2019 <br />Page 4 <br />No. 2018-04, DA No. 2018-02, & TPM No. 2018-01, — MainPlace <br />residential uses. The proposed, revised entitlements and net changes are outlined in Table 3: <br />Proposed Entitlements and Net Change on the following page. <br />Table 3: Proposed Entitlements and Net Change <br />Land Use <br />1983 EIR <br />2000 Parcel Map <br />2019 Specific <br />Plan Proposal <br />Proposed 204.9 <br />Net Entitlement <br />Change <br />Commercial <br />1,600,000 sq. ft. <br />1,509,255 sq. ft. <br />1,400,000 sq. ft. <br />-109,255 sq. ft. <br />Office <br />1,500,000 sq. ft. <br />1,500,000 sq. ft. <br />750,000 sq. ft. <br />-750,000 sq. ft. <br />Hotel <br />1,200 rooms <br />400 rooms <br />400 rooms <br />0 <br />Residential <br />None <br />None <br />1,900 units <br />+1,900 units <br />Currently there are 1,130,000 square -feet of commercial. With the existing commercial and <br />proposed entitlements and net changes detailed in Table 3, the proposed MainPlace Mall <br />Specific Plan would still accommodate an additional 270,000 square feet of new commercial <br />development. Because the site currently contains no office, hotel, or residential components, the <br />Specific Plan would also allow up to 750,000 square feet of office space, 400 hotel rooms, and <br />1,900 residential units. <br />Specific Plan <br />A specific plan is a zoning tool available to local jurisdictions to establish a master plan that <br />ensures high -quality, long-term development over a defined area. The specific plan has been <br />identified as the appropriate zoning tool for the MainPlace project site due to the presence of the <br />existing mall, the desire to introduce new uses over time, to ensure high -quality streetscape, <br />open space, architectural, and landscape design, and to reflect the single ownership of the entire <br />project site. In addition, the specific plan is implementing a mitigation measure of the 1983 EIR, <br />which states that development of the project site should occur through the specific plan process. <br />The specific plan will contain the components required by the State of California. Section 65451 <br />of the Government Code mandates that a specific plan contain the following components: <br />I. Introductory Plan Information VI I. Relationship of the Specific Plan's <br />Il. Summary Environmental Document to <br />III. Introduction Subsequent Discretionary Projects <br />IV. Land Use Planning and Regulatory Vill. Specific Plan Administration <br />Provisions IX. Specific Plan Enforcement <br />V. Infrastructure Plan X. Appendices <br />VI. Program of Implementation Measures <br />75D-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.