My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - WATER PAIN IMPROV PROJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
23A - WATER PAIN IMPROV PROJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:14:00 PM
Creation date
5/30/2019 7:10:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
6/4/2019
Destruction Year
2024
Document Relationships
STEPHEN DORECK EQUIPMENT RENTALS, INC. (2)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Page 2 <br />Thomton Park Neighborhood Water Main Improvements (15-6448), bidding on April 24, 2019 2:00 PM (Paciflc) Prtrrted o5t142019 <br />Bid Results <br />Type Item Code UOM city Unit Price Line Total Comment <br />3 1" Water Service per City Standard Plan 1401 <br />EA 201 $1.296.00 $260,295.00 <br />4 2" Water Service per City Standard Plan 1402 <br />EA 5 $5.215.00 $26,075.00 <br />5 4" Water Service per City Standard Plan 1403E <br />FA 1 $26,250.00 $26,250.00 <br />6 Fire Hydrant Assembly per City Standard Plan 1405 <br />EA 13 $8,525.00 $110,825.00 <br />7 PCC Cross Gutter Replacement per City Standard Plan 1109 <br />SF 1010 $39.00 $39,390.00 <br />8 PCC Curb Ramp per City Standard Plan 1122 <br />EA 2 $5,260.00 $10,500.00 <br />9 2" Blow -Off Assembly per City Standard Plan 1414 . <br />FA 1 $4,555.00 $4,666.00 <br />10 Sewer CCTV Inspection <br />LS 1 $16,750.00 $15,750.00 <br />11 Slurry Seal Surfacing (REAS, Type II)"t <br />TON 203 $910.00 $184,730.00 <br />12 Traffic Striping <br />LS 1 $20,345.00 <br />$20,345.00 <br />13 <br />As-Bullt <br />LS 1 $10.000.00 <br />$10.000.00 <br />14 <br />1" Combination fir Valves per City Standard Plan 1415` <br />EA 3 $4,920.00 <br />$14,760.00 <br />15 <br />Vertical Offsets per City Standard Plan 14138" <br />EA 3 $4.335.00 <br />$13.005.00 <br />16 <br />Labor Agreement Oversight <br />LS 1 $20,000.00 <br />$20,000.00 <br />Subtotal <br />$1,660,370.00 <br />Asterisk Notes (Per Section 3-2 of Standard Specifications) - NOT part of Total Bid Calculation <br />17 <br />" = The quantity for this bid Rem is shown for bid comparison only. This bid Item shall not be subject to the "25%" limit as stated in Section 3-2 of <br />the Standard Specifications. The actual amount for this Item will he dictated by the actual quantitiy used, <br />and the Agency reserves the right to <br />Increase or decrease the quantity, of this Item accordingly. <br />EA 0 0 <br />0 <br />PlanctBids, Inc. <br />23A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.