Laserfiche WebLink
RESOLUTION 2019-XXX <br />3.92%c <br />PROPOSED <br />REVENUE <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FY 18-19 <br />FEES <br />FY 19-20 <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />51602 <br />303) <br />Backflow Preventer (2 inches and bigger) <br />44.51 <br />46.25 <br />51602 <br />304) <br />Vacuum Breakers (I to 5) <br />20.33 <br />21.13 <br />51602 <br />305) <br />Vacuum Breakers (Over S - each) <br />5.81 <br />6.04 <br />51602 <br />306) <br />Hose Bib with Vacuum Breaker <br />15.47 <br />16.08 <br />51602 <br />307) <br />Grease/Waste Interceptor <br />37.56 <br />39.03 <br />51602 <br />308) <br />Dental Unit <br />32.30 <br />33.57 <br />51602 <br />309) <br />Medical Gas Piping (Fire Department) <br />44.51 <br />46.25 <br />51602 <br />310) <br />Alteration to Drain or Vent Piping <br />44.51 <br />46.25 <br />51602 <br />311) <br />Appliance not listed <br />65.57 <br />68.14 <br />51602 <br />312) <br />Sewage Ejector <br />65.57 <br />68.14 <br />51602 <br />313) <br />Sump Pump <br />65.57 <br />68.14 <br />51602 <br />314) <br />Hot Water Storage Tank <br />30.47 <br />31.66 <br />51602 <br />315) <br />Heat Exchanger <br />57.64 <br />59.90 <br />51602 <br />316) <br />Cooling Tower <br />65.57 <br />68.14 <br />51602 <br />317) <br />Booster Pumps <br />35.51 <br />36.90 <br />51602 <br />318) <br />Flreline/Hydrant (Each 100 Feet) <br />44.51 <br />46.25 <br />51602 <br />319) <br />Temporary Gas Meter, Prior to approval <br />Or Occpancy (30 Days) <br />At the time of application for temporary power, the owner <br />shall post a $1,000 cash or cashier's check conforming to the <br />Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br />Certificate of Completion or Certificate of Occupancy is issued. <br />PIPELINE PROJECT FEES PER RESOLUTION NO.2009-018 <br />Each Meter <br />244.09 <br />253.66 <br />46 <br />75A-2-56 <br />