My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75I - PH SUNFLOWER DESIGNATION CHANGE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75I - PH SUNFLOWER DESIGNATION CHANGE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:34:17 PM
Creation date
5/30/2019 7:14:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75I
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
occurs at an individual time period. Operating cycles for these types of construction equipment may <br />involve one or two minutes of full power operation followed by three to four minutes at lower power <br />settings. Other primary sources of noise levels would be due to random incidents, which would last <br />less than one minute (such as dropping large pieces of equipment or the hydraulic movement of <br />machinery lifts). <br />Table 17 <br />Typical Construction Equipment Noise Levels <br />Type of Equipment <br />Range of Maximum Sound <br />Levels <br />Measured (dBA at 50 feet) <br />Suggested Maximum Sound <br />Levels <br />for Analysis (dBA at 50 feet) <br />Rock Drills <br />83-99 <br />96 <br />Jack Hammers <br />75-85 <br />82 <br />Pneumatic Tools <br />78-88 <br />85 <br />Pumps <br />74-84 <br />80 <br />Dozers <br />77-90 <br />85 <br />Scrappers <br />83-91 <br />87 <br />Haul Trucks <br />83-94 <br />88 <br />Cranes <br />79-86 <br />82 <br />Portable Generators <br />71-87 <br />80 <br />Rollers <br />75-82 <br />80 <br />Tractors <br />77-82 <br />80 <br />Front -End Loaders <br />77-90 <br />86 <br />Hydraulic Excavators <br />81-90 <br />86 <br />Graders <br />79-89 <br />86 <br />Air Compressors <br />76-89 <br />86 <br />Trucks <br />81-87 <br />86 <br />A worst -case construction noise scenario was calculated using the Federal Highway Administration's <br />Roadway Construction Noise Model. The construction equipment that was used in the model was <br />based on the project's Air Quality and Greenhouse Gas Impact Analysis default construction equipment <br />list identified in the CaIEEMod modeling (Ganddini Group, Inc., 2019). <br />Demolition <br />The project would require demolition of the existing church, church parking lot and other site <br />improvements. The noise levels that would be generated to the adjacent land uses during demolition <br />activities are shown below in Table 18. <br />Legacy Sunflower Apartments Page 77 <br />Mitigated Negative Declaration —March 14, 2019 <br />751-163 <br />
The URL can be used to link to this page
Your browser does not support the video tag.